answersLogoWhite

0

EPC (Energy Performance Contracting) was effective for SFPUC (San Francisco Public Utilities Commission) as a solution to improve energy efficiency in their facilities. It helped them reduce energy consumption, lower utility costs, and achieve their sustainability goals by implementing energy-saving measures with guaranteed savings. Overall, EPC proved to be a successful tool for SFPUC to achieve their energy efficiency objectives.

User Avatar

AnswerBot

1y ago

What else can I help you with?

Continue Learning about Natural Sciences

What does the silver marking epc 237 mean?

The marking "EPC 237" on a silver item likely indicates that the piece is electroplated silver over copper. "EPC" stands for "Electro Plated Copper," and "237" could be a code for the specific type or manufacturer of the silver-plated item. These markings are used to indicate the base metal and silver content of the item.


What is a secondary solution?

A solution that has been titrated against a primary standard solution.


Why it is important to know the right percent strength of solution?

Knowing the right percent strength of a solution is important because it ensures that the solution will be effective for its intended purpose. Inaccurate percent strength can result in the solution being either too weak to be effective or too strong and potentially harmful. Proper knowledge of the percent strength also facilitates consistency and reproducibility in scientific experiments or processes.


If an enzyme in solution is saturated with substate What is the most effective way to obtain yield of produtct?

If an enzyme solution is saturated with substrate the most effective way to obtain a faster yield of products is to increase the enzyme concentration. An alternative is to increase the temperature.


What does blue mean in btb solution?

In BTB (Beyond the Box) solution, the color blue typically represents the recommended course of action or the optimal solution to a problem or challenge. It signifies the most effective or efficient approach based on the analysis or evaluation conducted.

Related Questions

What is an epc?

EPC stands for Engineering, Procurement, and Construction—a project delivery method where the contractor is responsible for all activities from design to handover. EPC construction projects offer a streamlined solution by managing the entire process under one contract.


epc london?

epc london


What are the objectives of EPC contract?

The objectives of EPC contract is to define the goals and expectation of a project. This is the same as with any other form of business contract. EPC refers to Engineering Procurement Construction.


Epc companies in Qatar?

i need a epc companys in qatar


In tender what is the meaning of EPC?

http://en.wikipedia.org/wiki/EPC


What does EPC mean on VW Jetta?

EPC stands for Electronic Power Control


Where is epc solenoid located?

!999 Mercury Mountieer EPC Solenoid were is it located


How do you submit an epc for a flat which is a room in the roof?

EPC stands for Emergency Performance Certificate. The EPC contains caveats, and its main aim is to enforce legislation on apartments.


EPC light golf 5 gti?

why my epc lights turned on my car GOLF 5 GTI? why my epc lights turned on my car GOLF 5 GTI?


What is the epc light for Skoda octavia?

what does epc mean on the dash bord of a skoda ovt mean


Is there an easy fix for the EPC light on a vw?

what causes the epc light to go on 2006 vw beetle


Is EPC Jobs a reputable site for finding a job in the oil and gas industry?

EPC is a type of job in the industry and not a company. You can find jobs listed at http://www.oilandgasjobsearch.com/jobs/EPC-jobs