The time required to demolish a building of approximately 50,000 square feet can vary significantly based on factors such as the building's structure, location, and the methods used for demolition. Typically, the process can take anywhere from a few weeks to several months. Factors like obtaining permits, safety measures, and environmental considerations can also impact the timeline. Overall, a detailed assessment and planning stage are crucial for an accurate estimate.

User Avatar

AnswerBot

1d ago

What else can I help you with?

Continue Learning about Natural Sciences

What steps should a civil engineer take when constructing a building in an earthquake prone area?

First the engineer should appraise himself of any building codes that have to be followed. These will require the building to be hardened against earthquakes and the engineer must ensure his building design and construction method/quality meets these codes. The engineer may also choose (with the customer for the building) to protect the building even further. Such protection may include isolating the building form its foundations with dampers and perhaps installing a counter mass in a tall building. All these additions would need to be computer modeled and scale tested to ensure they were effective for the type of ground movement expects.


How may square feet in 38 square meters?

The answer depends on the units used for the given quantities. It should be plainly obvious to anybody that the answer for 28 metres by 80 metres will be very different from that for 28 inches by 80 inches. So, without any information about the units for the given quantity, it is not possible to give a sensible answer.


How much stain do need to cover 470 square feet wood flooring?

To cover 470 square feet of wood flooring, you'll typically need about 1 gallon of stain for every 300-400 square feet, depending on the type of wood and its porosity. Therefore, for 470 square feet, you should expect to use approximately 1.5 gallons of stain. It's always a good idea to check the manufacturer's recommendations and buy a little extra to account for absorption and any touch-ups you might need.


How many inches of water column per pound of natural gas pressure?

14 inches equals one pound of natural gas pressure


How many 5-centimeter squares are needed to completely cover a square without overlapping?

It should be obvious that the answer depends on how large the bigger square is.

Related Questions

How do you demolish a building in Evony without dynomite?

Click on the building you want to demolish and on the box which comes up with the building you selected their should be a red circle and a line going diaginally in the little picture, click it and click demolish and demolish by 1 lvl


How to find the square footage of a building online?

To find the square footage of a building online, you can use a real estate website or a property assessment website. Enter the address of the building and look for the property details, which should include the square footage.


How many BTU should be supplied per square foot of building space?

20 btu per square foot


How much should it cost for commercial painting per square foot?

The typical cost range for commercial painters is approximately $2-$6 per square foot and $60-$100 per hour. However, the total cost of painting a commercial building will depend on a variety of factors such as the size of the building, labor expenses, material costs, and other relevant considerations.


How many employees per square foot in a factory?

In a factory there should be about 100 square feet per each employee. This means that if the building is 5,000 square feet, there should only be 50 employees.


What should you do when you reach the top of mount coronet?

demolish Team Galactic. KILL THOSE HATERS!!!!!!!!!!!!!!


How many square feet should a school be?

the average cost of a square foot of a school building is about 1500


Where is the BNN Building in Build-a-Bearville?

The BNN building is in the town square the one with the globe type thing on it and the time in red step on the paw at the door then you should be inside


How much should I pay approximately for linoleum flooring on a 40 square meter area?

My wooden floor needs some protection and I was thinking to have linoleum flooring. What is the price I should get this for a 40 square meter area?


How should you demolish part of a huge limestone slab in your basement?

Two words: sledge hammer. Drink plenty of fluids.


What is the square footage of a 9 sided building with a diameter of 28 feet?

Making the rather dubious assumption that the building is in the form of a regular nonagon (why should it be?), the area is 566.9 sq feet.


Commercial construction average cost per square foot Arizona?

The commercial construction cost per square foot in Arizona will average at about $101 per square foot. This means a 3,000 square foot building should cost about $300,000 to build.