I'm assuming by bricki you mean aggregate?
There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement.
with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water.
Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1
The amount of rebar in a cubic meter of concrete can vary depending on the design specifications of the concrete structure. Typically, rebar makes up around 1-2% of the total volume of concrete, so in a cubic meter of concrete, there may be around 20-40 kilograms of rebar.
This may help or not. A cubic meter of concrete weighs 1(one) tonne Metric. If you convert 1 tonne to pounds and a cubic meter to cubic yards, then, you have it. 1cubic meter=1.30795037 cubic yards. 1tonne=0.98420625 of a ton..1ton=2240pounds. Mate, I hope that's right. If not it'll give you something to go on with.
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
There are approximately 1.30795 cubic yards in a cubic meter.
ewan ko
7 cement bags per 1 cubic meter of concrete......
The amount of rebar in a cubic meter of concrete can vary depending on the design specifications of the concrete structure. Typically, rebar makes up around 1-2% of the total volume of concrete, so in a cubic meter of concrete, there may be around 20-40 kilograms of rebar.
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
it is 2400 kg
30
300 kilos.
0.2
10
That's going to depend on the shape of the cubic meter, because the drying happens where the concrete is in contact with the air. A slab will dry faster than a cube or a pier.
twelve
108