answersLogoWhite

0

A control measure is a step taken to manage and reduce risks to an acceptable level in a specific situation. It can include implementing safety procedures, using protective equipment, providing training and education, or making changes to equipment or processes to prevent accidents or incidents. Control measures are essential for maintaining a safe and healthy work environment.

User Avatar

AnswerBot

1y ago

What else can I help you with?

Related Questions

Within control measures analysis how might a control be mission-compatible?

if the risk control measure is consistent with mission objectives and budget constraints


Mention two control measure of plant pest?

Use of pesticides and burning of the affected plants are the two control measure of plant pest.


Which graphic control measure that is planned and immediate?

military symbols for defensive operations, frequent movements. concealment and deception. what is this graphic control measure?


What is different between control measure and a monitoring procedure?

the control measure is the condition that controls a hazard. the monitoring procedure is the recording to make sure the safe levels are not exceeded


What is the difference between a control measure and a monitoring procedure?

the control measure is the condition that controls a hazard. the monitoring procedure is the recording to make sure the safe levels are not exceeded


Measure to control earthquake?

We can't control earthquakes. Scientists are trying to measure pressure in rock formations and so be able to possibly foretell and warn that an earthquake may be imminent.


What tool is used in DMAIC measure phase?

A Pareto chart is the tool used in the DMAIC (define, measure, analyze, improve, and control) measure phase.


What tool is used in the DMAIC measure phase?

A Pareto chart is the tool used in the DMAIC (define, measure, analyze, improve, and control) measure phase.


What is an example of preventive control?

The separation of the Purchasing Department and Accounting Department personnel would be a preventative control measure.


What is measure to control ozone layer depletion?

There are various measures to control ozone depletion. Curbing CFC's is one of them.


Why is a control group necessary in the scientific experiment?

Without the control group, the test is not able to measure the difference with a standard condition


Which tool is used in standard improvement model of dmaic measure phrase?

A Pareto chart is the tool used in the DMAIC (define, measure, analyze, improve, and control) measure phase.