answersLogoWhite

0

Mistakes during the cell cycle, particularly in the S phase, can lead to incomplete or improper DNA replication. If damaged or unreplicated DNA is not repaired before the G2 phase, it can result in genomic instability. This can lead to issues such as mutations, chromosomal abnormalities, or even cell cycle arrest, which may ultimately contribute to tumorigenesis if the cell progresses to mitosis without proper checks. Therefore, accurate DNA repair mechanisms are crucial during G2 to ensure cell integrity.

User Avatar

AnswerBot

2mo ago

What else can I help you with?

Related Questions

What are the problems during a project life cycle?

There are several problems that can be encountered in a project life cycle such as but not limited to: lack of support from stakeholders and/or management, conservative timeline (unforeseen challenges), lack of resources among others.


Which one is formed during the Krebs cycle FADH2 or pyruvic acid?

FADH2 since pyruvic acid is needed to START the Krebs cycle


In most plants stomata on a leaf must be during the Calvin-Benson cycle?

In most plants stomata is usually opened on leaves to preserve water. As a result, CO2 is added during the Calvin Benson Cycle.


In most plants stomata on a leaf must be during the Calvin-Benson cycle.?

In most plants stomata is usually opened on leaves to preserve water. As a result, CO2 is added during the Calvin Benson Cycle.


In most plants stomata on a leaf must be during the calvin benson cycle?

In most plants stomata is usually opened on leaves to preserve water. As a result, CO2 is added during the Calvin Benson Cycle.


What are the result of chamical cycle?

chamical cycle


During the Calvin cycle many carbon-based molecules are rearranged What molecule is made as a result of these reactions?

glucose


During which cycle can you identify chromosomes?

Chromosomes can be identified during the cell cycle.


What happens to the chromosomes during the cell cycle which the nucleus divides?

IM haveing problems with this question and i cant answer it ...so woopty doo good luck to you


Some of the key problems with information systems that show up later in the systems development life cycle can be traced back to inadequate work during requirements determination how might this issue?

Some of the key problems with information systems that show up later in the systems development life cycle can be traced back to inadequate work during requirements determination. How might this issue be avoided?


What is the result of the water cycle?

Precipitation is the result of water cycle.Water falls as rain.


What does the cell cycle result in?

splitting of the cells