First: Consider WHAT will be your manipulative variable (a variable that you can control while other variables remain constant) that you believe will affect your experimentSecond: Consider HOW your responding variable will respond when you manipulate your manipulative variable after keeping everything else constantExample:First: My manipulative variable is mass of weight and you believe this variable will affect the speed of the trolley when roll down the railSecond: The larger the mass of the trolley, the faster it will move down the rail
The three main elements of educational planning are setting clear objectives and goals, designing appropriate strategies and policies to achieve those goals, and allocating resources effectively to support the implementation of the plan.
Controlled changes are alterations or modifications that are planned, monitored, and implemented in a structured manner to minimize disruption and ensure proper execution. Uncontrolled changes, on the other hand, are changes that occur without proper planning, documentation, or authorization, leading to potential risks and issues in the system or process.
This means to decide on the procedure to follow during the experiment. You decide which factor to vary, which factor to measure, and how you will control the other variables. You specify which measuring instruments you'll use, the number and frequency of your readings and the number of repeats for each reading.
No, writing is not considered a reflex action. Reflex actions are involuntary responses to a stimulus, controlled by the spinal cord without conscious thought. Writing involves cognitive processes, such as planning, organizing, and expressing ideas, which are not reflexive.
Inspection,Designing and Planning
Architecture
A static planning budget is suitable for planning and for evaluating how well costs are controlled.
The scope of B tech planning is implementation, designing and planning of a structure. This is the job of a civil engineer.
Nonsense
The likely word is "designing" (planning, developing).
The scope of B tech planning is implementation, designing and planning of a structure. This is the job of a civil engineer.
The correct spelling is "planning" (making plans, designing).
1) Planning and costing2) Designing and producing3) Testing4) Delivering
the art and science of designing and constructing buildings
planning,analyze,design,development,implementation
Navigation, triangulation, cartography. Planning and designing on construction sites.