answersLogoWhite

0

Low energy applications can be smaller than the 14 AWG branch wiring. Examples of this are the wiring for door bells, thermostats, intercoms and communications.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

What is the minimum branch-circuit wire size that may be installed in a dwelling?

14 awg


What is the minimum branch circuit wire size that may be installed in a dwelling?

14 awg


What is the minimum branch-circuit wire size installed in a dwelling?

The minimum size home wiring is #14 AWG, the rating for that size wire is 15 amps.


Is there a minimum dwelling square footage requirement in North Carolina?

The square footage requirement is different per county. You must research per your county for the minimum dwelling square footage requirement.


What is minimum capacity of direct cold water storage in domestic dwelling?

415 liter


What is the Minimum branch circuit wire size in a dwelling?

The minimum size home wiring is #14 AWG, the rating for that size wire is 15 amps.


What is the minimum space required for a toilet and sink to be installed in a bathroom?

The minimum space required for a toilet and sink to be installed in a bathroom is typically around 30 inches by 60 inches.


What is the minimum space utilization of the B tree with the exception of the root?

50 percent


What is the minimum space utilization for a B tree index with the exception of the root?

50 percent


How many inches above the floor should stationary be installed at a minimum?

8


What is the minimum amount of points required for one to be a professional golfer?

The minimum amount of points required for golfers at professional events is 1.2 points. An exception to this is major championships where the minimum is 1.5 points.


What is the minimum kw service demand load for twenty 6.5 kW ranges in a multifamily dwelling?

To find the minimum kW service demand load for twenty 6.5 kW ranges in a multifamily dwelling, you would simply multiply the number of ranges by the kW rating of each range. In this case, 20 ranges x 6.5 kW = 130 kW minimum service demand load.