answersLogoWhite

0

A combination of hops and valerian at bedtime can provide a good night's sleep.

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

Do the actual results deviate from what was expected If so explain how?

whats the meaning accurately expected results and actual results


Why is calculating the standard deviation an important part of data analysis?

It is a measure of the spread of the results around their expected value.It is a measure of the spread of the results around their expected value.It is a measure of the spread of the results around their expected value.It is a measure of the spread of the results around their expected value.


What results can be expected from a combination of alternative therapies to treat insomnia?

A combination of alternative therapies should bring a difference in disturbed sleep within two to four days.


How did your observed results compare to your expected results?

The observed results were in line with the expected results, indicating that the hypothesis was supported. This suggests that the experiment was conducted correctly and the variables were controlled effectively.


When is TN plus two 2010 results expected?

The Plus 2 results are expected in two days probably on 13th or 14th as the notification is expected to be issued today.


When will be Tn 2 results 2009?

Results are expected on MAy 8th 2009.


When results turn out differently than what the reader has expected this is known as?

When results of a story turn out differently than expected it may be called a twist or surprise ending.


What are the expected results for incompatibility test?

No Reaction At All.


When jntu kakinada is going to release 3 2 results?

results expected on 26th June


When is puc results Bangalore 2014?

The PUC results Bangalore 2014 are expected to be out in July or August.


What term is used to describe the process of monitoring operating results and comparing actual results with the expected results?

This process is known as performance monitoring or performance evaluation. It involves analyzing actual operating results against planned or expected results to assess the efficiency and effectiveness of business operations.


Are expected results due to chance or are they arrived at mathematically?

Expected results can arise from both chance and mathematical calculations. In probabilistic contexts, expected values are calculated using mathematical formulas based on probabilities and outcomes. However, in experimental settings, observed results may also reflect random variations or chance. Therefore, while mathematical methods provide a framework for predicting expected results, actual outcomes can be influenced by stochastic factors.