Dando Drilling was created in 1867.
Drilling 4,876 holes can be referred to as a "bulk drilling" operation or simply "high-volume drilling." This term emphasizes the large quantity of holes being created, often for industrial, construction, or mining purposes. The specific context may further define the process, such as "mass drilling" or "production drilling."
ResponsibilitiesI am a drilling contractor and am working on this field for many years .I am owning a Sydney based drilling and boring company named AV Drilling . So i can explain you from my own experience. It is the responsibility of the Drilling Contractor to drill the well to the correct program specifications and to provide a well bore that is 'fit for purpose', subject to the terms of the contract. The Drilling Contractor shall not compromise safety or well integrity in order to reach the drilling objectives. A drilling Contractor develops, plans, costs and supervises the operations necessary for drilling oil and gas wells. They are involved from the initial well design to testing, completion and abandonment.Drilling Contractor work with other professionals, such as geologists and scientists.
The choke panel in drilling is used to regulate the flow of drilling fluid (mud) during the drilling process. It allows operators to control pressure and manage wellbore stability by adjusting the flow rate of the mud being circulated. This is crucial for preventing blowouts and maintaining safe drilling conditions. Additionally, the choke panel helps in managing the return flow of cuttings and maintaining optimal drilling efficiency.
The drilling rig was not given a name but is simply referred to as "the Spindle top drilling rig".
PDL in drilling operations stands for "Planned Depth Limit." It refers to the maximum depth that a drilling operation is intended to reach based on geological assessments and engineering calculations. The PDL helps guide drilling activities, ensuring that operations remain within safe and economically feasible boundaries while also optimizing resource extraction. Adhering to the PDL is crucial for managing risks and costs associated with drilling projects.
The population of Dando Drilling is 46.
Dando Cocotazos was created on 2003-11-18.
UCL Jill Dando Institute was created in 2001.
Y Sigue La Mata Dando was created on 2005-02-01.
Evan Dando's birth name is Evan Griffith Dando.
Jill Dando's birth name is Jill Wendy Dando.
Shawn Dando's birth name is Shawn Allen Dando.
VAM Drilling was created in 2006.
Precision Drilling was created in 1969.
Odfjell Drilling was created in 1973.
North Drilling was created in 1998.
Trinidad Drilling was created in 1996.