answersLogoWhite

0

Dando Drilling was created in 1867.

User Avatar

Wiki User

11y ago

What else can I help you with?

Continue Learning about Other Engineering

What do you call drilling 4876holes?

Drilling 4,876 holes can be referred to as a "bulk drilling" operation or simply "high-volume drilling." This term emphasizes the large quantity of holes being created, often for industrial, construction, or mining purposes. The specific context may further define the process, such as "mass drilling" or "production drilling."


What does a drilling contractor do?

ResponsibilitiesI am a drilling contractor and am working on this field for many years .I am owning a Sydney based drilling and boring company named AV Drilling . So i can explain you from my own experience. It is the responsibility of the Drilling Contractor to drill the well to the correct program specifications and to provide a well bore that is 'fit for purpose', subject to the terms of the contract. The Drilling Contractor shall not compromise safety or well integrity in order to reach the drilling objectives. A drilling Contractor develops, plans, costs and supervises the operations necessary for drilling oil and gas wells. They are involved from the initial well design to testing, completion and abandonment.Drilling Contractor work with other professionals, such as geologists and scientists.


What is the choke panel used for in drilling?

The choke panel in drilling is used to regulate the flow of drilling fluid (mud) during the drilling process. It allows operators to control pressure and manage wellbore stability by adjusting the flow rate of the mud being circulated. This is crucial for preventing blowouts and maintaining safe drilling conditions. Additionally, the choke panel helps in managing the return flow of cuttings and maintaining optimal drilling efficiency.


What was the name of the oil rig that drilled Spindletop?

The drilling rig was not given a name but is simply referred to as "the Spindle top drilling rig".


What is PDL in drilling operations?

PDL in drilling operations stands for "Planned Depth Limit." It refers to the maximum depth that a drilling operation is intended to reach based on geological assessments and engineering calculations. The PDL helps guide drilling activities, ensuring that operations remain within safe and economically feasible boundaries while also optimizing resource extraction. Adhering to the PDL is crucial for managing risks and costs associated with drilling projects.