To find the next day Baxter will both water and mow the lawn, we need to determine the least common multiple (LCM) of the two intervals: 3 days (watering) and 7 days (mowing). The LCM of 3 and 7 is 21 days. Since they last both occurred on July 2, adding 21 days brings us to July 23. Therefore, Baxter will next water and mow the lawn on July 23.