answersLogoWhite

0

• CPU utilization and response time: CPU utilization is increased if the overheads associated with context switching is minimized. The context switching overheads could be lowered by performing context switches infrequently. This could however result in increasing the response time for processes.

• Average turnaround time and maximum waiting time: Average turnaround time is minimized by executing the shortest tasks first. Such a scheduling policy could however starve long-running tasks and thereby increase their waiting time.

• I/O device utilization and CPU utilization: CPU utilization is maximized by running long-running CPU-bound tasks without performing context switches. I/O device utilization is maximized by scheduling I/O-bound jobs as soon as they become ready to run, thereby incurring the overheads of context switches.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

Parameters are save settings for selection criteria for the following?

Search screens tables and reports


Parameters are saved settings for selection criteria for what?

Print Settings, Report Settings, and Screen Settings


Which five criteria comprise a modems port settings?

A modem's port settings typically comprise the following five criteria: the port number, which specifies the communication endpoint; the protocol, indicating the type of communication (e.g., TCP, UDP); the baud rate, determining the speed of data transmission; data bits, which define the number of bits in each data packet; and parity, which is used for error checking in data transmission. These settings ensure proper communication between devices.


In what circumstances can cooperative scheduling take place?

Cooperative scheduling can take place when multiple parties agree to work together to coordinate and allocate resources efficiently, typically in situations where there is a shared goal or benefit to be achieved. This can occur in various settings such as project management, job scheduling, and resource allocation.


Which Selection Criteria Are Parameters Saved Settings For?

Vendor Data, Default Data, and Profile Data


How is appointment abbreviated?

The word "appointment" is commonly abbreviated as "appt." This abbreviation is frequently used in scheduling contexts, such as in calendars or medical settings, to save space and time.


When Plays and stories both involve characters settings and conflict but what differentiates the two?

structure


Is stream scheduling most common in medical offices?

Stream scheduling is not the most common approach in medical offices; instead, many practices use appointment scheduling, which allows for specific time slots for patients. However, stream scheduling can be effective in certain settings, such as urgent care or walk-in clinics, where patient flow needs to be managed efficiently. It focuses on minimizing wait times and maximizing the use of available resources, but its adoption varies based on the type of medical practice and patient needs. Overall, traditional appointment scheduling remains more prevalent in most medical offices.


How do you get to settings on your computer?

You can use the following command to change network settings in your computer: 1) Go to run. 2) Write 'ncpa.cpl' command.


What are some examples of financial conflict of interest in professional settings?

Some examples of financial conflict of interest in professional settings include receiving kickbacks for recommending certain products or services, investing in a company that you are supposed to be impartial towards, or accepting gifts or favors that could influence your decision-making.


How can you use the reporting scheduling function to run a daily report?

To use the reporting scheduling function for a daily report, first, create or select the desired report in your reporting tool. Then, navigate to the scheduling settings and set the frequency to "daily," specifying the time you want the report to run. Ensure you input the recipients' email addresses if you want them to receive the report automatically. Finally, save the schedule, and the report will run daily at the designated time.


How can you use the report scheduling function to run a daily report?

To use the report scheduling function for a daily report, first access the reporting tool within your application. Select the desired report and configure its parameters, such as date range and filters. Then, set the scheduling options to run the report daily at a specific time, ensuring you enter the appropriate email addresses or destinations for the output. Lastly, save the settings, and the report will automatically generate and deliver each day as specified.