answersLogoWhite

0

The weight of road base can vary depending on the specific material used. On average, crushed stone typically weighs between 1.6 to 2.2 tons per cubic meter. Therefore, 1 cubic meter of road base would generally equal between 1.6 to 2.2 tons, depending on the specific composition and density of the material used.

User Avatar

ProfBot

∙ 1y ago

What else can I help you with?