To calculate the force required to do work on a 70N load, we need more information about the distance over which the work is being done or the work being done. The equation for work is Work = Force x Distance x cos(theta), where theta is the angle between the force and the direction of motion.

User Avatar

AnswerBot

1y ago

What else can I help you with?

Continue Learning about Physics

If you lift two loads up one story how much work do you do compared to lifting just one load up one story?

The work done by lifting two loads up one story vs the work done lifting one load will depend on the weight of the second load. If it is the same as the first load, it would simply be twice the work to lift. Work is described as a force times a distance and a force is described as a mass times an acceleration. In this case, the force would be twice as much, so the work would be as well.


How much work is done when a load is moved 10 meters by a 50 netwon force?

The work done is calculated as the force applied multiplied by the distance moved in the direction of the force. Therefore, the work done would be 500 Joules (50 N * 10 m).


What is the relationship between input force output force and load force?

The input force is the force applied to a system, while the output force is the force produced by the system. The load force is the force exerted by the load on the system. In an ideal situation, the output force is equal to the input force, but in reality, due to factors like friction and mechanical efficiency, the output force may be less than the input force. The load force is the force that the system must overcome to perform work.


How much work is done in lifting a 300-lb load of bricks to a height of 60 feet on a building under construction?

The work done in lifting the load of bricks can be calculated using the formula: work = force x distance. In this case, the force is the weight of the load (300 lbs) and the distance is the height it was lifted (60 feet). Therefore, the work done is 18,000 foot-pounds (300 lbs x 60 feet).


If a load of mass 10n stretches a cord by 1.2cm what is the total work done?

The work done by the load can be calculated using the formula: work = force x distance. In this case, the force is the weight of the load (10 N) and the distance is the stretch of the cord (1.2 cm = 0.012 m). Therefore, the total work done is 0.12 Joules.

Related Questions

How do you find the effort force if you already have the load force and the distance moved by load force?

work (effort) equals load times distance


If you lift two loads up one story how much work do you do compared to lifting just one load up one story?

The work done by lifting two loads up one story vs the work done lifting one load will depend on the weight of the second load. If it is the same as the first load, it would simply be twice the work to lift. Work is described as a force times a distance and a force is described as a mass times an acceleration. In this case, the force would be twice as much, so the work would be as well.


How much work is done when a load is moved 10 meters by a 50 netwon force?

The work done is calculated as the force applied multiplied by the distance moved in the direction of the force. Therefore, the work done would be 500 Joules (50 N * 10 m).


What is work done by a coolie walking on a horizontal platform with a load on his head?

The work done by the coolie is zero because the force he exerts is in the vertical direction (lifting the load against gravity) while the displacement is in the horizontal direction. Work is only done when the force and displacement are in the same direction.


What is the relationship between input force output force and load force?

The input force is the force applied to a system, while the output force is the force produced by the system. The load force is the force exerted by the load on the system. In an ideal situation, the output force is equal to the input force, but in reality, due to factors like friction and mechanical efficiency, the output force may be less than the input force. The load force is the force that the system must overcome to perform work.


How does a simple machine make a hand brake work?

A simple machine uses a single applied force to do work against a single load force. Ignoring friction losses, the work done on the load is equal to the work done by the applied force. They can be used to increase the amount of the output force, at the cost of a proportional decrease in the distance moved by the force.


What is dependancy load?

Dependency Load is a portion of the population that is not in the work force; Total people under 14 and over 65.


A fulcrum is on the left side of a board as it is moved to the right will the force be the same?

Work: The work done by the force is the same as the work done on the load in an ideal simple machine.


How much work is done in lifting a 300-lb load of bricks to a height of 60 feet on a building under construction?

The work done in lifting the load of bricks can be calculated using the formula: work = force x distance. In this case, the force is the weight of the load (300 lbs) and the distance is the height it was lifted (60 feet). Therefore, the work done is 18,000 foot-pounds (300 lbs x 60 feet).


How does input force output orce and load force work together in a lever?

because if there wasn't an input force, or any one of those, the machine would not work properly


Work is done only if?

Work is done if a force moves through a distance. Eg Someone standing carrying a heavy load is not considered to doing work unless the load is moved


If a load of mass 10n stretches a cord by 1.2cm what is the total work done?

The work done by the load can be calculated using the formula: work = force x distance. In this case, the force is the weight of the load (10 N) and the distance is the stretch of the cord (1.2 cm = 0.012 m). Therefore, the total work done is 0.12 Joules.