200 kg car^^
The weight that an electromagnet crane can lift depends on its design and power. Small electromagnet cranes can lift a few hundred pounds, while larger industrial ones can lift tens of tons. It's important to consult the crane's specifications and limitations before attempting to lift objects.
The work done to lift the log can be calculated using the formula: Work = Force x Distance. In this case, the force is 5000 N and the distance is 5 meters. Therefore, the work required to lift the log 5 meters would be 5000 N x 5 m = 25000 Joules.
The work done to lift the petrified log 5 meters can be calculated using the formula: work = force × distance. In this case, the work required would be 25,000 joules (5000 N × 5 meters).
It depends on how big it is and what type it is. We had a mobile (can be driven over the road) crane here last year that could pick up 500 tons. I hear they build mobile cranes that can lift as much as 750 tons. Stationary cranes can lift a lot more, but are harder to move.
A 100 ton crane can lift up to 100 tons of weight, which is equivalent to 200,000 pounds or 90,718 kilograms. This weight capacity assumes that the crane is properly set up and operating within its rated limits.
The pulley was discovered to lift objects that would otherwise be too heavy to lift. Much in the way a crane is used to lift cargo onto ships.
That depends on the specifications of the crane. The largest crane in the world is capable of lifting 20,000 Metric Tons (tonnes).
The maximum load that the crane can lift is 18 metric tons (39,690 pounds), but the crane cannot lift that much weight if the load is positioned at the end of the jib. The closer the load is positioned to the mast (center of rotation), the more weight the crane can lift safely.
Up to one ton, apparently..
The weight that an electromagnet crane can lift depends on its design and power. Small electromagnet cranes can lift a few hundred pounds, while larger industrial ones can lift tens of tons. It's important to consult the crane's specifications and limitations before attempting to lift objects.
minimum 150 joules
10 METERS
The work done to lift the log can be calculated using the formula: Work = Force x Distance. In this case, the force is 5000 N and the distance is 5 meters. Therefore, the work required to lift the log 5 meters would be 5000 N x 5 m = 25000 Joules.
The work done to lift the petrified log 5 meters can be calculated using the formula: work = force × distance. In this case, the work required would be 25,000 joules (5000 N × 5 meters).
It depends on how big it is and what type it is. We had a mobile (can be driven over the road) crane here last year that could pick up 500 tons. I hear they build mobile cranes that can lift as much as 750 tons. Stationary cranes can lift a lot more, but are harder to move.
A 100 ton crane can lift up to 100 tons of weight, which is equivalent to 200,000 pounds or 90,718 kilograms. This weight capacity assumes that the crane is properly set up and operating within its rated limits.
The work done to lift the object is equal to the force applied multiplied by the distance moved in the direction of the force. In this case, the work done would be 500 newtons x 8 meters = 4000 joules.