What is meant by brick soling?

Brick soling refers to a method of laying a temporary or permanent foundation using bricks. It involves placing a layer of bricks flat on the ground to create a stable base for a structure. Brick soling helps in distributing the load and preventing moisture from seeping through the foundation.


What is the brick soling?

Brick soling is a method of laying of bricks in brickwork.It is of two types 1. When the brick is laid flat on its back it is flat soling. 2. When the brick is laid on its edge it is edge soling.


How do you spell sowling?

The word may be soling (adding a sole to a shoe). Also Soling, a class of racing sailboat.


What is given off as a by-product?

soling


What is the Portsmouth yardstick for a soling?

The list at Ben Fleet Yacht Club gives a suggested trial number for the year 2004 of '914' for the Soling.


What is the Portsmouth yardstick for a Soling keel-boat?

The list at Ben Fleet Yacht Club gives a suggested trial number for the year 2004 of '914' for the Soling.


What is length of a soling sailboat?

~27ft just under.


What is the purpose or function of the stone soling used in building construction?

soling is done before laying the foundations and to provide better strength to the foundation. it is done by means of stone aggregate of random sizes between 50mm - 150mm.


What is the function of the stone soling used in building construction?

to provide better platform to foundation


What are the Dimensions of a Soling sailboat?

all dimensions are listed on abbots site: http://www.abbottboats.com/soling.htm


What is purpose of soling in civil engineering structures?

The main pupose of Soling is to consolidate the layer for purpose of laying foundation. It consists of digging the earth to a required depth and laying the crushed stone quarries one adjacent to another and filling the gaps with the sand. After laying for the entire area, consolidating with the Heavy Rollers or by ramming is done. Over this either a pier or regular foundation is carried out.