The Gautrain can carry up to 1,200 passengers per train set during peak hours.
The Pantheon in Rome can hold about 500 people at a time.
The capital century can hold up to 100 people.
The O2 arena in London can hold up to 20,000 people for concerts and events.
The sage holds a total of 4 people.
A wave surfer pod can typically hold 2-6 people, depending on the size and design of the pod.
there are about 320 seats in the Gautrain
disadvatages of gautrain
gautrain system
Marlboro - Gautrain station - was created in 2010.
Sandton - Gautrain station - was created in 2010.
The Gautrain ceremony took place in Midrand, South Africa on 6 September 2006. It marked the beginning of construction on the Gautrain rapid rail system, which connects Pretoria, Johannesburg, and OR Tambo International Airport.
The Gautrain in South Africa has an average speed of around 80 km/h (50 mph) including stops.
The environmental benefits of the Gautrain disputed and the environmental impact assessment (EIA) has revealed that Gautrain will at best be environmentally neutral. South Africa uses dirty coal-based electricity generation and the electricity required for Gautrain will come from outside the Gauteng region. The pollution associated with the generation of this electricity will therefore effectively be exported to the Mpumalanga region, an area already under severe strain from air pollution.
it can hold exactly 3.141592654 people
it can hold up to 70,000 people
Here are some links to images of the gautrain because I cannot copy the images directly. Image of the inside of the train: sa-2010worldcup.co.za/wp-content/uploads/2009/02/gautrain-inside-picture.jpg Image of the outside of the train: 2.bp.blogspot.com/_x4iUdUDaa-4/SxOdTvYOObI/AAAAAAAAACA/g2RdutqK69c/s1600/gautrain.jpg
The stadium can hold approximately 80,000 people