To convert cubic yards of concrete to tons, you need to know the weight of concrete, which is typically around 4,000 pounds per cubic yard. Therefore, .50 yards of concrete would weigh approximately 2,000 pounds, or 1 ton. So, .50 yard of concrete is equivalent to 1 ton.
50 tons weighs 50 tons.
43.75 tons
This depends on how much rock you will use per square yard. Suppose you intend to use 1/100 tons (=20 lb) per square yard. Then if you have one ton of rock, it will cover 100 square yards. Similarly, if you intended to use 1/50 tons per square yard, 1 ton will cover 50 square yards. In general you want to use factor labeling: If you are using x tons per square yard, then write this as (1 square yard) / (x tons of rock) = (1/x)*(square yards/tons of rock) This is called a conversion factor. Now, if you have some quantity of rock, say y tons of rock, and you want to see how many square yards it would cover you just multiply (y tons of rock)*(1/x)*(square yards/tons of rock) = y/x (square yards*tons of rock/tons of rock) = y/x square yards since the labels just divide out.
The cost of reserved seats at a concert can cost any where from $50 to $500. The price depends on who is giving the concert, where the concert is, and how much of a demand is there for the ticket.
I got sean Paul concert tickets and they cost , $50.
50 tons
50-100 tons.
It weighed about 50 tons...
50 tons
300 x 2/12 = 50 cubic feet 27 cu ft = 1 yard 50 cu ft = 1.85 yards. That is about 2.4 tons
50 tons equal 100,000 pounds.
25 tons is much heavier.