answersLogoWhite

0

If you have the latest version of PMB, select the video you want, then click on Manipulate. Then select Convert to WMV and save. After doing this you should be able to import the file into Windows Movie Maker.

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

How do you copy or transfer pics from pmb to windows movie player?

To transfer pictures from PMB (Picture Motion Browser) to Windows Movie Player, first, open PMB and locate the photos you want to transfer. Select the images and choose the option to export or save them to a folder on your computer, such as the Desktop or Pictures folder. Once the images are saved, open Windows Movie Player and import the photos from the folder where you saved them. You can then arrange and use them in your movie project.


If you are trying to put a video from PMB onto Windows Movie Maker but you can't find the file - what should you do?

Try using the Start Search tool (Start, Start Search) or Run Command feature on your computer to locate the video by name.


The last step in developing a Performance Measurement Baseline (PMB) is to?

The last step in developing a Performance Measurement Baseline (PMB) is to finalize and obtain approval for the PMB from relevant stakeholders. This ensures that all parties agree on the scope, schedule, and budget parameters for project performance measurement. Once approved, the PMB serves as a reference point for tracking project progress and performance throughout its lifecycle. Regular updates and monitoring against the PMB will facilitate informed decision-making and project control.


What is the last step in developing a Performance Measurement Baseline PMB?

The last step in developing a Performance Measurement Baseline (PMB) is to integrate the established scope, schedule, and cost into a cohesive baseline document. This includes finalizing the project schedule, allocating resources, and ensuring that all stakeholders have reviewed and approved the PMB. Once approved, the PMB serves as the standard for measuring project performance and progress throughout its lifecycle. Regular updates and revisions may be necessary as the project evolves.


What does PMB stand for?

PMB can stand for various terms depending on the context, but it commonly refers to "Project Management Body of Knowledge," which is a set of standard terminology and guidelines for project management. In a different context, PMB might also refer to "Post Mail Box," used in mailing addresses. Additionally, in healthcare, it can stand for "Pharmacy Management Branch." Always consider the specific context to determine the correct meaning.


Can you use a pmb address with a street number as your home address?

A PMB (Private Mailbox) address typically cannot be used as a legal home address because it does not represent a physical residential location. Many legal and official documents require a verifiable street address. However, some may use a PMB for receiving mail while maintaining a separate, legitimate residential address for legal purposes. Always check local regulations and requirements for your specific situation.


Does seat ups flatten stomach From Gugu Ntsimbi PMB?

Yes it helps try it u wont regret it.


What is the postcode for ketu lagos Nigeria?

Unfortunately Nigeria does not have a postcode system. P. O. Box and PMB are more in use.


What is valid reason for rebaselining the performance measurement baseline PMB?

The plan for completing the remaining contract effort is no longer achievable.


What is Shane dawsons house address?

12501 Burbank Blvd. suite 4 PMB 252 Valley Village, Ca 91607


Shane Dawson's po box?

12501 Burbank Blvd. suite 4 PMB 252 Valley Village, Ca 91607


What is a valid reason for rebaselining the Performance Measurement Baseline (PMB)?

There may be considerable risks associated with the current PMB indicating a need to rebaseline the program in order to make it executable. Changing the PMB can be caused by any one of the following three reasons:Contract changes : only applies to changes/contract modifications directed by the government, not the contractor.Internal re-planning : occurs when the contractor's original plan needs adjustment in response to problems or the opportunity to capitalize on efficiencies. The remaining work is then replanned by the contractor PM using the remaining budget and schedule.Formal re-programming : occurs when the remaining budget and schedule is unrealistic; the contractor requires more time and dollars; the PMB exceeds the contract target cost and an over target baseline (OTB) occurs and the budget is insufficient; and the original objectives cannot be met.