The top of the chimney should be at least two feet higher than a level point ten feet away from a level line to the roof.
It should go through the roof above the sink. It may run in the wall or attic to the main 4 inch stack and tie in there. Most will be an 1 1/2 or 2 inch pipe above the sink.
What is the developed lenght and a VENT STACK should be no less then 4" passing through the roof full size to prevent hoarfrost
Nope, should be 4" to prevent hoarfrost
1 metres
normally (and many places have their own code for this) a chimney has to be at least 2 feet higher than any roof within 10 feet of the chimney check your local building dept for code compliance
A stack vent is is the extension of a soil or waste stack above the highest horizontal drain connected to the plumbing stack Vent stack a vertical vent pipe extending through more then two stories which is then connected to a stck vent or is otherwise extended throgh the roof, installed primarily for the purpose of providing circulation of air to and away from any part of the drainage system
it should be 5 feet
the sea erodes the stack to such a point until the wasn't enough suport and the roof colapsed making the arch become a stack.
A roof ladder or an extension ladder can be used for accessing the roof of one's home. One should take precautions when using a roof ladder to ensure safety. One should position the ladder so the bottom of the ladder is away from the wall one foot for every four feet in height it will be raised. The top of the ladder should be extended no more than four feet above the roof line. One should keep their body in the center of the rungs as they climb the ladder.
not a lot
If you are referring to your vent stack it will be on the roof, either 2" is smaller services and 4" is main line out of the house in either PVC or cast iron. If you are referring to your vent stack it will be on the roof, either 2" is smaller services and 4" is main line out of the house in either PVC or cast iron. If you are referring to your vent stack it will be on the roof, either 2" is smaller services and 4" is main line out of the house in either PVC or cast iron.