Why not check your local codes? Normally A trap should be located no more then 2 feet from the fixture being served and the vent no more then 2 ft from the trap thus you have 4 feet to play with CHECK LOCAL CODES
Roll roofing should be installed horizontally across the rise of the roof, NOT vertically from edge up to peak.
You can just extend the waste line from wherever it is currently to where the new drain point begins, its much easier connecting into an existing line than to try create a new one.
If there is not a fan,or ventilation in your tower case then overheating can occur.
Because
Select a row
No, moving pay elements across the T account can lead to inaccuracies in financial records. It is important to maintain clear and accurate documentation of all transactions in their respective accounts to ensure proper accounting practices.
You should almost always walk your bike across the street. If there are nobody else walking across you can ride it across.
you should save it
As part of the text
It should as there are no indications as to it not existing
If you are creating captions for existing visuals, they should be treated in a way that offers precision and clarity. Viewers should be able to read the caption and know exactly what the visual is depicting.
No, it should be placed horizontally. If it on the top rain will get into in and drown the chicks. If its on the bottom nothing can get in once the nest is built.