About 4 hours for marine diesel. Bunker fuel takes a bit longer as it needs to be heated and is hard to pump.
It is called a short salute and is how ships greet each other.
later has the long a sound and freighter sounds like the a sound
app. 12 days for an old 1930-freighter.
20 years
There is not a way to answer this question. It would all depends on how fast they are draining the lake.
The VL250 does not have a fuel guage. You can use the trip meter to judge how long before you need to fill the tank.
It took 6 years.
where is screen located in gas fill mine takes a long time to put any fuel in. There is no screen in the fill hose. The vent tube is probably pinched and is the source of your problem.
Dale Hollow Lake was created by the construction of the Dale Hollow Dam, which began in 1943 and was completed in 1950. The lake took several years to fill after the dam's completion, reaching full pool in 1951. Therefore, it took approximately eight years from the start of construction to the lake being fully filled.
A very long time. I am interested in the number of days at sea.
The address of the Long Lake Library is: 1865 Wayzata Blvd West, Long Lake, 55356 9322
Long Lake, IL is in Lake county.