4 days
64. Its simple. 24/12=2 and 32*2=64.
There is no clue.
Assume X is the number of each bricklayer's workload per day. To build the same wall, the workload of 3 bricklayers in 10 days should equal to 2 bricklayers' in Y days. Thus, 3*10*X=2*Y*X, rearrange it and get Y=15. It takes 2 bricklayers 15 days to build the same wall.
(150*45)/125
as far as i know all eggs hatch at the same rate and it takes 21-25 days
Assuming it was going at the same rate, then the answer is 1250 days.
540 days is about the same as 18 months.
six
Ans- It will take 4 men to complete the work in 35 days.
It takes a few days, beginning immediately. This is why you shouldn't train the same muscles for a few days. It takes a little less though for slow-twitch fibers, like those of your abs.
No, the Galilean moons do not revolve around Jupiter at the same rate. Each moon has its own unique orbital period, ranging from about 1.8 days for Io to about 16.7 days for Callisto.
1 wall = 5 men X 8 days = 40 man days 40 man days / 3 men = (40/3) days = 13 1/3 days