answersLogoWhite

0

The engineer has to take into consideration many fact available about the area like soil conditions, the topography of the environment, and weather conditions. Additionally he has to look at the requirements of the bridge itself such as the width of the bridge and the weight it must carry.

User Avatar

Wiki User

11y ago

What else can I help you with?

Related Questions

What concerns did engineers have in building the confederation bridge?

Ice burgs and birds


When did engineers begin using concrete in bridge building?

in 1822 in 1822


What were the challenges that the engineers faced when building the clifton suspension bridge?

2 suicides


How did Roman engineers solve the problem of having a dry place to begin building a bridge?

Build cofferdams


What engineers start with B?

· Biochemical Engineer · Biomedical Engineer · Brake Engineer · Bridge Engineer · Building Engineer


What do you call the type of engineer that designs bridges?

civil engineers, structural engineers, and architects are the main bridge builders.


When was Association of Building Engineers created?

Association of Building Engineers was created in 1925.


What do bridge engineers invent?

bridges


What caused the millennium bridge in London to wobble?

The engineers that were responsible for building the bridge, created the 3D bridge on a 2D model. Plus the weight that the bridge could hold, was not calculated right for the people. Oops!


Why do building engineers use math?

Building engineers use math to help them figure out how big or how small to make the house or whatever they are building.


How did the engineers face the challenges on building the macinac bridge?

Engineers faced significant challenges while building the Mackinac Bridge, including harsh weather conditions, strong currents, and the need for precise engineering to ensure stability and safety. They employed innovative techniques, such as using a floating derrick to position the bridge's massive towers and conducting extensive wind tunnel testing to assess the bridge’s design. Additionally, the team meticulously planned the construction phases to minimize disruptions and maximize efficiency. Their collaboration and adaptability ultimately led to the successful completion of the bridge, which remains a vital transportation link.


When was Chartered Institution of Building Services Engineers created?

Chartered Institution of Building Services Engineers was created in 1976.