it was made by dog
Construction of the Snowy Mountains Hydro-electric Scheme began on 17 October 1949.
The engineer of the Snowy Mountains Scheme was Sir William Hudson, an Australian engineer who played a pivotal role in designing and overseeing the construction of this ambitious hydroelectric and irrigation project in Australia. The scheme, initiated in the late 1940s, involved the construction of a complex network of dams, tunnels, and power stations in the Snowy Mountains region, transforming Australia's water management and energy production. Hudson's leadership and engineering expertise were crucial to the project's success, which has had a lasting impact on the country's infrastructure.
Also known as the Snowy Mountains Hydro-electric Scheme, construction of the Snowy River began on 17 October 1949. Planning, however, had begun many years earlier.
The Snowy Mountains Scheme is located about 100 kilometres south of Canberra in New South Wales, the Snowy Mountains area.
Construction of the Snowy Mountains Hydro-electric Scheme began on 17 October 1949. It took 25 years to complete, so was finished in 1974.
$820 million
lollipops milo
Prior to the development of the Snowy River Hydro-Electric scheme, when the snow in the Snowy Mountains thawed, the water simply flowed into the rivers of New South Wales and Victoria, and then out to sea.
Italians were some of the many cultural groups who came to work on the Snowy Mountains Hydroelectric Scheme. The bulk of the Italians came during the 1950s.
he was the first commissioner for the snowy mountain hydro
The Snowy Mountains Scheme is a hydroelectricity and irrigation complex in south-east Australia. The waters of the Snowy River and its tributary, the Eucumbene, are captured at high elevations and diverted inland to the Murray River and the Murrumbidgee River, through two tunnel systems driven through the Snowy Mountains. The water falls 800 metres and travels through large hydro-electric power stations which generate peak-load power for the Australian Capital Territory, New South Wales and Victoria.[1][2] The Scheme was completed by 1974, after twenty-five years of construction, and is the largest engineering project undertaken in Australia.[1][3] The Scheme's construction is seen by many "as a defining point in Australia's history, and an important symbol of Australia's identity as an independent, multicultural and resourceful country".[3] The Snowy mountains scheme is a network of dams and reservoirs that are used to run a hydro electric generation system. ( source Wikipedia)
Australia, New South Wales, America, built under the direction of engineer William Hudson. The Snowy Mountain Scheme was noted by its immigrant European workforce.