A local architect or someone who understands your local building code can answer your question.
The main plumbing stack in a building's plumbing system serves to vent sewer gases and allow proper drainage by connecting all the branch lines to the sewer line.
The purpose of the plumbing main stack in a building's drainage system is to collect and carry wastewater and sewage from different plumbing fixtures on various floors of the building to the sewer or septic system. It acts as a vertical pipe that allows for efficient and effective drainage throughout the building.
A plumbing professional in the field of main stack plumbing is responsible for installing, repairing, and maintaining the main vertical pipe that carries wastewater from multiple plumbing fixtures in a building. They ensure proper drainage and prevent blockages or leaks in the main stack system.
No, a residential condo does not require a main breaker in each unit. Typically, the main breaker is located in the electrical room or utility room of the building, and it controls the power supply to all the units. Each unit may have individual circuit breakers, but a main breaker is not required in each unit.
I do not live in a condo thus I have no need to shut the main valve
Most of the time they are. Depends on how far of course. Usually, the toilet is by the main stack so it only has to go the 12 to 16 inches to get to the drain. The main stack goes through the roof for the vent for the whole house or the bath and laundry. As long as the toilet is getting venting from somewhere, it should still flush.
The main building for Hindus is the temple.
Yes.
The main advantage to having a condo is the property upkeep. Most condos have a condo fee, but this fee covers all outside maintainence, such as landscaping, lawn mowing, and snow plowing. Many condos also offer free exercise facilities.
A stack vent pipe is a vertical pipe that extends from the drainage system to the outdoors, serving to ventilate the plumbing system and allow sewer gases to escape. It helps maintain atmospheric pressure in the drainage system, preventing traps from being siphoned dry and ensuring proper drainage. In residential plumbing, the stack vent typically connects to the main drainage stack and must extend above the roofline to meet building codes and prevent backflow of odors into the home.
Main Court Building was created in 1963.
UCL Main Building was created in 1985.