To shoot grade on manholes using offset survey stakes, first establish a reference point at the desired elevation for the manhole rim. Place offset stakes at a predetermined distance from the manhole location, ensuring they are level with the reference point. Use a level or laser to check the height of the stakes and adjust them as needed to match the reference elevation. Finally, measure the difference in height from the stakes to the manhole to determine the necessary adjustments for grading.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Related Questions

What are Blue top stakes vs red top?

In construction grade staking: blue tops (2x2x6 to 12 inch stakes) mark the level of finish grade; red tops (2x2x6 to 12 inch stakes) mark the level of sub-grade; the color comes from lumber crayons used by the surveyor to ID the stakes by colorizing stake tops;


June 9th 1973 Secretar won the Triple Crown What is the Triple Crown?

Three grade one stakes in just five weeks..Kentucky Derby, Preakness Stakes, Belmont Stakes.


What Equipment used to carry out survey of building?

Nicole grade


What is convenience sampling in math?

It is where they survey is pretty much already for you Example: Mrs. Wolfe's 5th grade class is given the survey


When was E. P. Taylor Stakes created?

The E. P. Taylor Stakes was created in 1956 at Woodbine Racetrack in Toronto, Canada. It is a Grade I turf race for fillies and mares aged three years and older.


2000 Lincoln ls you want to up grade and put 18inch rims on your car what bolt pattern N offset will fit your car?

5x108 with +35/+40 offset


Is the derby a handicap race?

No, it is a grade 1 Stakes Race where male horses carry 126 pounds and females carry 121.


Does a survey have variables?

Yes, a survey typically includes variables that are measured or observed, such as demographics, opinions, behaviors, or attitudes. These variables help researchers analyze and interpret the data collected from the survey.


Is the Kentucky Derby a handicap race?

No, it is a grade 1 Stakes Race where male horses carry 126 pounds and females carry 121.


I'm doing a survey. It's for 7th Grade-12thGrade school boys. How many hours a week do you spend doing sports?

I'm in 7th grade. This is a rough estimate, but probably 18 hrs.


How do you build a concrete form?

A concrete form is just a box that holds wet concrete in shape until it sets. They are normally wood but I've seen metal forms a lot too. It has to be removable when the concrete hardens, usually by taking it apart. First, find your grade, that's the level you want the concrete to be at when it's finished. Drive some stakes around the area and suspend strings where the edges will be. Drive larger stakes along the strings. Fasten the boards to the stakes with the top edge on grade. Make sure to support it a lot along the board with additional stakes because concrete is very heavy. Add or remove fill in the form until you have the depth you want. Your ready to pour.


How do you read a construction survey stake?

To read a construction survey stake, look for markings that indicate measurements or alignment. Typically, these markings include distance to a reference point, grade elevation, and other relevant information for the construction project. Consult the project's survey plans and coordinate with the site surveyor if there are any uncertainties.