Winter home construction can be recommended with proper planning. It offers advantages like better contractor availability, faster permit approvals, and potential cost savings due to off-season demand. Builders often have more flexible schedules, allowing for efficient progress. However, winter also brings challenges such as weather delays, difficulty in pouring concrete, and increased heating requirements on-site. Cold temperatures can affect material performance, especially adhesives and finishes. Despite these concerns, with the right crew and winter-specific building techniques, construction can proceed smoothly. If timelines and weather conditions are managed well, starting in winter can be a strategic choice for early spring completion.
In the winter snow is the biggest factor.
Winter and Construction - 2011 was released on: USA: 16 September 2011 (internet)
The recommended spacing for metal studs in wall construction is typically 16 inches on center.
The recommended gravel sizes for driveway construction are typically between 0.75 to 1.5 inches in diameter.
Construction adhesive
The recommended subflooring plywood thickness for a residential construction project is typically 3/4 inch.
The recommended thickness for OSB subflooring in residential construction projects is typically 23/32 inch.
The recommended ceiling drywall thickness for a residential construction project is typically 1/2 inch.
The recommended spacing between studs for standard wall construction is typically 16 inches on center.
The recommended spacing for ceiling studs in a residential construction project is typically 16 inches on center.
The recommended spacing for floor joists in a residential construction project is typically 16 inches on center.
Winter and Construction - 2011 Creeps 1-12 was released on: USA: 17 February 2012