depends on bad size and product, the calculations for what you are asking are on the bags back and product websites
4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
typically one pallet, i believe theres 42 80lb bags on a pallet.
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
4.4 bags
7 cement bags per 1 cubic meter of concrete......
4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
2million
25
15 milligrams
0.1865 bag
10
Here's a link to a great concrete calculator that will compute that for you!
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
10.94 bags