it was developed in 410 B.C.
Ernest Rutherford developed the first nucleus and electron model of the atom. It was based on experiments conducted by Geiger and Marsden.
Talcot Parsons
Bohr
John Dalton
Capability Maturity Model
CMMi means Capability Maturity Model Integration
cmmi is is an integrated model for system, software, supplier sourcing and ippd. but cmm have separate model for all these things
SEI is the Software Engineering Institute. CMM stands for Capability Maturity Model. CMM has been replaced by CMMI (Capability Maturity Model Integration). For full details, go to http://www.sei.cmu.edu/cmmi/faq/comp-faq.html.
CMMI stands for Capability Maturity Model Integration. It is a model for IT and ITES organizations. CMMI contains 5 levels. They are Initial, Managed, Defined, Quantitatively Managed and Optimizing. All the levels except the Initial level, contains several Key Process Areas. And all the Key Process Areas contain Specific goal, Specific Practices and Generic goals and Generic Practices respectively.
Ron Kenett has written: 'Process improvement and CMMI for systems and software' -- subject(s): Capability maturity model (Computer software), Software engineering 'CMMI and Process Improvement for Systems and Software'
CMMi level 3 Certified company
The functions and features of CMMI are to insure there are no bad blocks of memory. CMMI helps to solve the maturity problem of software within a organization.
What are the CMMI,ISO9001:200 and SIX SIGMA? what are the uses with these?
Levels are used in CMMI to describe an evolutionary pathrecommended for an organization that wants to improve the processesit uses. A CMMI organization certified on a certain level, just denotes that the organization satisfies the criteria required by CMMI certification level.
The standard is usually referred to as CMMI Level 5. SEI, the Software Engineering Institute, is the body that created the standard.
HCL is just CMMi Level 3. This is confirmed by HCL employee.