Yes, as long as it has the necessary ampacity for the load and is properly fastened at each terminal. For example, we have a 4/0 aluminum cable feeding our 200 A subpanel 120 feet away.
To answer this question the voltage value and whether the system is three phase or single phase needs to be given.
No, you cannot put but one set of wires in a meter base. The way to go about this, is to mount an outside panel beside your meter base. Panel sized to existing house service, equipped with two main breakers. One to re-feed the house panel the other to feed your shop.
It is not in parallel. You put a breaker in existing panel and use that to feed the subpanel. The Amperage of this subfeed breaker should match the rating of the new panel. For example a 100A breaker might be typical. Remember that ground and neutral are only "bonded" at the main panel. Usually a subpanel has a means to separate the neutral and ground in a subpanel. Be careful since everything about doing this is dangerous.Another AnswerYes, you can have two breaker panels in parallel. If you had a 100 amp panel on a 200 amp service (or increase the size of the service, check with your power company on the size of your service, you could add a second 100 amp panel in parallel with the first. You can have up to 6 disconnects per service, but they must be located adjacent to each other or in the same enclosure. So either install the second panel beside the first or a 100 amp disconnect beside the first panel and feed out of the disconnect to the new panel located where you need it.
Yes
No, the conductor is too small. The feeder to a 120/240 volt sub panel should be a 1/0 copper or a 2/0 aluminium conductor. This size conductor will limit the voltage drop to 3% or less when supplying 125 amps for 125 feet on a 240 volt system. ACWU 90 (Armoured Cable Wet location Underground 90 degree C). ACWU 90 cable is code approved for direct burial and is used in many projects as an underground service distribution feeder. Aluminium is much cheaper than copper for this type of installation.
check your local codes for this
The cable box itself would not be an issue. Cable boxes will not work on their own, there must be a live feed of cable for the box to have channels to choose from. If someone is not paying for that cable to be available at that residence but for whatever reason there is a live feed coming through, it would be seen as illegal.
To answer this question the voltage value and whether the system is three phase or single phase needs to be given.
Whether you have an overhead or underground feed, that section of the installation is referred to as Service Entrance Conductors. On an overhead installation, it includes the conductors on BOTH sides of the meter, from the service drop conductors (attached at the service head) to the service equipment LINE terminals. On an underground installation, it refers only to the conductors between the meter's LOAD side and the service equipment LINE terminals. The conductors on the LINE side of the meter come from a distribution transformer and are unbroken between the transformer and your meter.
No, you cannot put but one set of wires in a meter base. The way to go about this, is to mount an outside panel beside your meter base. Panel sized to existing house service, equipped with two main breakers. One to re-feed the house panel the other to feed your shop.
No. Any connections to the detached garage have to be after the main disconnect of your house panel. You have two options here. You can replace meter with a meter disconnect combo and have the main feed your house and add a breaker to feed the garage or You could install a 400 ap service and place two disconnects at the meter. one for the house and one for the garage. unless you are going to have a serious electrial load in the garage you sould just feed off the panel in the house for cost effectiveness.
It is not in parallel. You put a breaker in existing panel and use that to feed the subpanel. The Amperage of this subfeed breaker should match the rating of the new panel. For example a 100A breaker might be typical. Remember that ground and neutral are only "bonded" at the main panel. Usually a subpanel has a means to separate the neutral and ground in a subpanel. Be careful since everything about doing this is dangerous.Another AnswerYes, you can have two breaker panels in parallel. If you had a 100 amp panel on a 200 amp service (or increase the size of the service, check with your power company on the size of your service, you could add a second 100 amp panel in parallel with the first. You can have up to 6 disconnects per service, but they must be located adjacent to each other or in the same enclosure. So either install the second panel beside the first or a 100 amp disconnect beside the first panel and feed out of the disconnect to the new panel located where you need it.
Coaxial, RG-59.
The sub-panel need to be fed from the main panel, by way of a circuit breaker connected to one of the breaker locations. Or if your sub-panel has a main breaker installed you can feed from the main panel with a sub-feed lug kit. This looks like a breaker, but is only a point where you can branch off the sub panel.
Yes
Does the garage have a separate breaker box or fuse box inside? Is there a separate power feed for the garage? In the 70's and 80's some cities were allowing aluminum wiring INSIDE residences. If the wire from the main fuse/breaker panel is aluminum there is a real possibility that you might have a bad connection between the fuse box or breaker panel and the outlets in the garage.
You need a special adapter that usually run $17.