The cost of any refinishing project will be determined by the existing condition of the surface, the previous coating and the desired final appearance. Architectural details and features can also influence cost.
.50 per sq.ft
depends on where you are, how much materials cost, etc. I've been going with 26 bucks a square foot and generally it's worked out.
300 sq ft
$20 per yard would be $2.22 per sq ft.
i get $3.72 per sq ft $3.72 per sq ft would be $55550.76 . The correct answer is 26.8 cents per sq ft.
A local realtor can answer your question.
cbs construction what is the cost per sq ft.
A turn key house can cost anywhere from $80 per square ft to $200 per square ft
3000 sq-ft multiplied by $10=$30,000 (you would multiply your square-footage by your cost per sq-ft)
125-130 per sq ft
Normally $5.00 per ft MIn of 100 ft
About $2 per sq ft.