answersLogoWhite

0

No

User Avatar

Wiki User

10y ago

What else can I help you with?

Related Questions

Why was the London tower bridge constucted?

Tower Bridge was constructed as an opening bridge to allow boats with tall masts to get into the Pool of London. It became available for use in 1894.


When was the first London tower bridge built?

Construction on Tower Bridge in London began in 1886 and it was completed in 1894. Tower Bridge in Sacramento was finished in 1935.


What is the design or style of London bridge?

The present London Bridge, in London, is a pre-stressed box girder bridge. Tower Bridge is often mistakenly referred to as London Bridge. The old London Bridge was dismantled and shipped to Lake Havasu, Arizona and is the second biggest tourist attraction in the state. The photograph displayed here is of Tower Bridge.


What type of brigdge is the tower bridge what year it was completed in and how long did it take to complete it?

Tower Bridge is a bascule bridge and is the only bridge in London which can open to allow tall ships to pass under it - although that doesn't happen very often now. It was officially opened for use by the public in 1894.


What do they use to make the London bridge?

The current London Bridge in London is a pre-stressed concrete box girder bridge.


Is the tower of London a landmark?

No, the tower of London is not a land mark. In fact it use to be a prison.


What is the Tower of London use for today?

The tower of London is a home to many people and a palace for the queen


How many floors is the tower of London?

The Tower of London is comprised of one tower. The Tower of London has had many different uses over the years. The most notable use was as a prison and a place of executions.


What did they use to make the tower bridge?

Steel and stone.


do you have to use the underground train from London bridge to the o2 arena or not?

You can get an underground train and an overground train from London Bridge.


Is there a toll for London bridge?

No. It is free to use.


What material do the use to build the London bridge?

The current London Bridge, built in 1973, is a pre-stressed concrete structure.