answersLogoWhite

0

The current London Bridge in London is a pre-stressed concrete box girder bridge.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

do you have to use the underground train from London bridge to the o2 arena or not?

You can get an underground train and an overground train from London Bridge.


Is there a toll for London bridge?

No. It is free to use.


What material do the use to build the London bridge?

The current London Bridge, built in 1973, is a pre-stressed concrete structure.


What materials is used to make London bridge?

The current London Bridge is a pre-stressed concrete box girder bridge.


What is the design or style of London bridge?

The present London Bridge, in London, is a pre-stressed box girder bridge. Tower Bridge is often mistakenly referred to as London Bridge. The old London Bridge was dismantled and shipped to Lake Havasu, Arizona and is the second biggest tourist attraction in the state. The photograph displayed here is of Tower Bridge.


Do you have to pay t use the tower bridge in London?

No


Why was the London tower bridge constucted?

Tower Bridge was constructed as an opening bridge to allow boats with tall masts to get into the Pool of London. It became available for use in 1894.


How did the London bridge get it name?

Because the original bridge was the ONLY bridge in London at that time.


What is the famous bridge is in London?

Tower Bridge and London Bridge.


What types of rock is used to make London bridge?

None. The current London Bridge, built in 1973, is a pre-stressed concrete structure.


How did builders make the London bridge so long?

The length of the bridge was decided by the width of the river.


What direction is Tower Bridge from London Bridge?

Tower Bridge is east of London Bridge.