Want this question answered?
Process Costing
Job order costing is more appropriate than process costing when the product being produced is a custom product
to undersrand
I'm not sure of the order, but these are definitely somewhere in the top 10, if not the top 5. Foster's Brewery, Australia SABMiller Brewery, South Africa, Coors Brewery, Golden, CO Anheuser-Busch Brewery, St. Louis, MO Anheuser-Busch Brewery, Van Nuys, CA
Job costing or as some may know it, Job order costing is fundamental to managerial accounting. It differs from Process costing in that flow of cost is tracked by job but not a process. The main difference is that Job costing is in the nature of jobs/work and process costing in a process.
A job order costing system would be more appropriate than a process costing system for manufacturers who use different types of goods throughout the manufacturing process. Process costing is best to you when manufacturing a large amount of the same items.
Job Order Costing Operation Costing Normal Costing Actual Costing Standard Costing Kaizen Costing Target Cost
Yeh totally no doubt
true
Job Order 1. Many different jobs are worked during different periods 2. Costs are accumulated by individual jobs 3. Job cost sheet is the key document controlling the accumulation of costs by a job 4. Unit costs are computed by the job on the job cost sheet while comparing these characteristics with Process costing we find that: Process costing 1. A single product is produced either on the continued basis or in the long periods 2. Costs are accumulated by departments 3. Department product report is the key document 4. Unit costs are computed by departments
No, you can order them on the website;)
Job costing involves the detailed accumulation of production costs attributable to specific units or groups of units. For example, the construction of a custom-designed piece of furniture would be accounted for with a job costing system.Process Costing involves the accumulation of costs for lengthy production runs involving products that are indistinguishable from each other. For example, the production of 100,000 gallons of gasoline would require that all oil used in the process, as well as all labor in the refinery facility be accumulated into a cost account, and then divided by the number of units produced to arrive at the cost per unit.