Control the shaft speed

It is assumed that before starting the turbine, the operator will first familiarise himself

with the general piping layout and the operating characteristics of the unit, after which

he will proceed as follows:

1. Inspect the governor mechanism and oil where necessary.

2. If the drain ahead of the throttle valve has been closed for any reason, again

open until all water of condensation has been removed.

3. Now open the throttle valve to 5% to set the rotor in motion.

4. As soon as the turbine is rolling, observe vibrations and wait until equilibrium will

be established.

5. Increase the governor set point to 10 % wait until the vibrations are less than

20% to minimize stresses on the shaft and than increase the governor set point

to 20 %.

6. When the vibration is lower than 30%, indicating evenly heated turbine rotor,

increase the governor set point from 20 to 40%. Be careful not to set the speed

range 1700-1900 rpm, which are the critical speed ranges.

7. Increase the governor set point further to reach normal speed.

8. When normal operating speed is reached the turbine is ready to load.

The rotor absorbers the torque produced in the rotating blades from the expansion of

the steam and transmits it through the coupling at the ends to the following shaft and

eventually to the generator. Rotor speeds for the HP and IP elements of high

pressure, high temperature designs are typically 3000 rpm, 50 Hz. The LP elements

generally operate at the same speed although in some instances, to obtain additional

exhaust-annulus area, the LP elements are on a separate shaft and rotate at 1500

rpm.

Synchronising and connection of main circuit-breaker

Circuit breaker

In power plants, switching is achieved with a circuit breaker. Before the circuit

breaker is closed to connect two live generating systems, both voltages and

frequencies must be the same, and in particular, the two AC waveforms must be

exactly in phase. If they are not, with the inertia of several large generators behind it,

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

6

the utility system will jerk the plant generator into phase is a fraction of a second,

shearing the generator shaft or much worse. The business of correctly closing a

circuit breaker that connects to AC systems in known as synchronizing and it may be

done manually, under relay supervision, or fully automatically.

Voltage control

The output voltage of an alternator running at rated speed, and not connected to

other alternators, is a function of the excitation. On a single unit, the level of field

excitation can be changed manually with a rheostat. For alternators connected to

parallel, it is virtually impossible to control the field excitation level manually to

compensate for changes in the reactive power flow. Voltage regulators are used to

regulate the excitation of an alternator and thus the output voltage or reactive power

output. Voltage regulators usually sense only one phase, but for more accuracy,

three-phase voltage sensing may be desirable.

The power factor

The power factor is a way of representing the extent to which alternating current

drown by the plant is out of phase with the voltage. It is expressed as the ratio (or

percentage) of real power (watts) to apparent power (volts*amperes). Most industrial

plants have a power factor somewhere between 70 and 95 percent.

It is convenient to divide the apparent power into two vector components: real power

and reactive power. Both components are important in power generation and must

be metered and controlled separately.

Synchronization

Manual synchronization. A synchronizing panel will originally contain two voltmeters,

two frequency meters and a synchroscope and/or synchronizing lights. One voltmeter

and one frequency meter monitor the incoming machine and the others monitor the

running machine. The synchroscope pointer indicates the phase angle between the

two generator voltages. Synchronizing lights usually serve as backup to the

synchroscope.

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

7

Automatic synchronization. Many types of automatic synchronizers have been

designed to replace some of or all the manual synchronizing functions. On large

machines, there are primary backups in manual synchronizing schemes to block

closing of the circuit breaker too far out of synchronism. Highly accurate and reliable

automatic synchronizing relays are available with adjustable ranges to monitor both

synchronism and the voltage levels of the machines being synchronized.

Oil firing

As soon as ignition has taken place, the oil and air mixture must be adjusted to

produce a stable flame. At this point it is best to have a flame slightly yellow,

indicating a deficiency of air. The operator must learn how to adjust the fuel and air

supply to obtain the lemon-colored flame required the starting up period. After the

correct flame conditions have been obtained, the boiler is brought up to temperature

slowly as with other fuels.

It is essential when burning fuel oil that the operator know the equipment and attend

to certain details to assure satisfactory operation. The burners must be regulated to

prevent the flame from striking the boiler heating surface or furnace walls. If this

precaution is not taken, localized heating will cause a burned out tube or rapid

deterioration of the furnace wall. It is important to ignite burners in 1, 3, 2 and 4

sequence. The reason of this procedure is to have uniform temperature distribution in

the furnace.

Care and adjustment are necessary in regulating the air supply to the furnace. The

usual procedure is to supply a steam or primary air with atomized oil and after the

combustion has started to introduce the additional requirements as secondary air.

Change to coal firing

With the system of pulverization, each boiler is equipped with one ore more

pulverizing mills through which the coal passes on its way to the burners. The coal is

fed to these pulverizing mills by automatic control, to meet the steam demand. No

separate drying is necessary since warm air from an air preheater is supplied to the

pulverizer mill where drying take place. This stream of primary air carries the fine coal

from the pulverizer mill through the burners and into the furnace. Combustion starts

as the fuel and primary air leave the burner tip. The secondary air is introduced

directly into the furnace, where it mixes with the coal and primary air. The velocity of

the primary and secondary air creates the necessary turbulence, and combustion

takes place with the fuel in suspension.

Control of the mill output is accomplished by the damper located in the primary air

fan inlet. This damper serves as a fuel regulator and may be operated by the boiler

automatic combustion control. The feeder output is regulated by the coal level in the

mill cylinder.

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

8

The pulverizers may be directly connected to the motor drive and operated at high

speed. Control of pulverizer output is accomplished by varying the coal feed and the

flow of primary air, either by hand or by automatic control.

The secondary air is supplied under pressure by the forced draft fan. It is important to

adjust the primary air pressure to prevent the flame from striking the furnace walls

and boiler tubes.

Once the start sequence is finished and all burners are operative on coal, then it is

possible to shut off burners operated on the oil.

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

9

Exercise N1.1 for training: Handling the simulator

Objectives

1. Press "Initial Conditions" on the keyboard. [Shift F6]

2. Select "Block connected".

3. Start the simulator with "Running" [F1]. Check that the clock is running (top of

the left corner).

4. Press "Picture Directory" on the keyboard [Home].

5. Select picture MD 260, "Main Steam Lines".

6. Check that steam data in the steam main line is approx. 30 bar, 330 oC Main

Steam Line take the steam from superheater 3 in the boiler to the main team

valve at the HP- turbine. Read and write down the data on the line close to the

HP- turbine.

7. Select picture MD 300 (Between IP- and LP- turbines on MD 260).

8. Check that the power is about 30 MW. (Numbers on the Generator)

9. Press "Picture Directory" at the keyboard [Home].

10. Select picture MD 170.

11. Check that all four burners on level D are running and that the pressure in the

furnace is close to -20 mm H2O.

12. Go to picture MD 180. (On the right side from the "Coal Silo")

Take in the flames by pressing the button on "Plane D" in the display module.

13. Open the controller for O2 in flue gas by pressing "C" in "Oxygen Controller"

[CTR1801]. Check that the set point is 2 % and that the actual value is stable.

14. Read and write down the contents of CO in flue gas on the display for "Carbon

Mono Oxide" and note the value.

15. Decrease the set point for O2 to 1 % (set value and press "Enter") and find out

how much the content of CO will Increase. Press F8 to go to "Alarm Log

Summary Display". Click on the blinking value to reset the alarm for high

content of CO. Note the value of CO when it is stable. Reset the set point for

O2 to 2.1 %

16. Freeze the simulation [F2].

17. Go to "Initial Conditions" [Shift F6] and select "Cold Plant".

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

10

18. Start the simulation with "Running" [F1].

19. Press "Picture Directory" [Home]. Select picture MD 100, "Fuel Oil system".

20. Start preheating of the oil in the tank by opening (right click) the valves V01023

and V01024 (bottom of the left corner: to check mouse over) and switch the

temperature controller into "Auto".

21. Drain some water from the tank by opening "HFO service tank bottom drain

valve" (at the bottom of Fuel Oil Service Tank).

22. Read the oil temperature in the tank. Check that the temperature is slowly

increasing.

23. Stop simulation with "Freeze" [F2].

24. Go to "Initial Conditions", select "Block Connected" and start the simulation with

"Running" [F1].

25. Read and note steam pressure and generator power on picture MD 300 and

fuel consumption (at the bottom: fuel oil flow G01850) on MD 200.

26. Start all four burners on plane C (MD 160). Be careful with the pressure in the

furnace (should not be high). Do not ignite a new burner (wait some time) if the

pressure is high on the positive side. Start with burner 1 (press "start" on the

control panel) and followed by 3 -2 -4.

27. Select "Initial Conditions" and freeze the simulation. Increase the simulation

speed to 5. Start simulation again with "Running" [F1].

28. Press "Picture Directory" [Home]

29. Select "Pen Recorder" (MD 130).

30. Click on 'Tagname' and write the tagnumber (P03006) Note: Block Letters. The

Variable will be searched in the database.

31. Select the limits 0 and 100 bar and start the plotting of the variable by clicking at

the button for "Channel 1". Repeat the procedure for variable E03812

(Generator Power) on "Channel 2".

32. Increase the firing intensity to 25 % on picture MD 190. The increasing takes

place by writing the value for fuel oil (25 %) on BLM (Block Load Master

Controller Output). Check that the value for fuel oil increase from 9 t/h into15

t/h.

33. Read the fuel consumption on page MD 200.

34. Follow how the steam pressure and the generator power will increase. Look at

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

11

page MD 300 and the plotting on "Pen Recorder". Read the values when the

plant is stabilized.

35. Freeze the simulation [F2].

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

12

Exercise N1.2: Rolling up of turbine train and connection of

generator to the grid

Objectives:

Control the shaft speed

1. Press "Initial Conditions" on the keyboard [Shift F6].

2. Select "Ready for rolling up".

3. Start the simulator with "Running" [F1].

4. Press "Picture Directory" on the keyboard [Home].

5. Select picture MD 300, "Steam Turbines".

6. Increase turbine governor set point to 5 % (press INCR/DECR to adjust the right

value). Observe opening of all safety shut-off valves and steam extraction

valves. Observe turbine speed. Select picture MD 380 (bottom under the

generator) and observe that the generator excitation is not activated (grey

colour of generator excitation).

7. Increase governor set point to 10 %. Observe turbine speed increase to

approximately 1100 rpm.

8. Watch turbine vibrations (at the right upper corner). When vibrations are less

than 20% on the indicator, increase governor set point to 20%. This should give

a final turbine speed of about 1500 rpm.

9. When the vibration is lower than 30%, indicating evenly heated turbine rotor,

increase the governor set point from 20 to 40%. Be careful not to set the speed

range 1700-1900 rpm, which are the critical speed ranges.

10. Increase the governor set point to approximately 68%. When the speed is

above 2800 rpm, observe automatic stopping of electric LO pumps (bottom on

the left corner). Select picture MD 380 and observe activation of the generator

excitation.

11. Increase governor set point approximately to 3005 rpm,. In order to achieve this

value press INCR/DECR. Do it step by step not to miss the right speed.

Remember speed of the shaft increasing not in parallel with governor speed

value. It has some time delay.

Synchronizing and connection of main circuit-breaker

1. Select picture MD 300

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

13

2. Increase the generator excitation (press INCR) until the voltage at the main

circuit-breaker is equal to the line voltage (press INCR one again to stop

increase of the voltage), and the syncronoscope indicates "VOLT OK".

3. When the voltage and frequency is correct, connect circuit-breaker (press

CONN). Synchronizing is automatic. (MD380/X3832)

4. Immediately after connection, increase turbine load by increasing the governor

set point to 80% in order to avoid return power trip of the main circuit-breaker.

(MD300)

5. Frieze simulation [F1].

6. Select "Initial Conditions" and change "simulation speed ratio" form 1 to 3. Set

appropriate speed ratio in the "simulator speed ratio" section and press [Enter].

7. Start simulation with "Running" [F2].

Load rising (oil burners)

1. Increase the firing intensity to 25% (15t/h) on picture (MD190). Set block load

master controller output to 25% and press [Enter].

2. Ignite the burners on the Plane C in sequence 1, 3, 2, 4. (MD160) To ignite the

burner press "Start".

3. Increase the firing intensity to 35% (MD 190).

Connection of auxiliary circuit-breaker (Block Binding)

1. Reduce HP bypass steam press control minimum position from 12% to 0% type

the value and press [Enter] (MD260/C12618). To find and to check the HP

bypass steam press control valve (C12618) use "mouse over" function.

2. Stop steam dumping to direct heater by setting LP bypass steam pressure

controller (Z22603) from AUTO to MAN (to find use mouse over function). Set

value of 0 % and press [Enter].

3. Increase governor set point to 100%. (MD300)

4. Check MVAR readout and adjust generator excitation if necessary (MD380).

5. Check that the generator power is higher than auxiliary block load and connect

auxiliary circuit-breaker. (MD380/X03835)

Tutorial N1: Rolling up of turbine train and connection of generator to the grid 03.02.1004

14

6. Check cos-phi and adjust the generator excitation if required. Normal cos-phi is

0.9 - 0.95. (MD380)

Change to coal firing

1. Check the preliminary air supply to coal mill D, open the primary air fan shut-off

valve (V01720). Activate the start sequence for coal mill Plan D on the operatorpanel

(X01761).

2. When the start sequence is finished and all burners are operative on coal, then

shut off burners 1 to 4 by pressing "Stop" bottoms.

3. Repeat the procedure for burner on Plane C.

4. Observe and adjust the oxygen controller. Normal set point on coal firing is

3,5%.

5. Increase the firing intensity to 45%.

6. Freeze simulation.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How can manage synchronization between generator and power grid in geo thermal power plant?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Who uses semaphore?

Semaphores are used in computer science for process synchronization. They help control access to shared resources to prevent conflicts between processes running concurrently. Operating systems and programming languages utilize semaphores to manage critical sections of code and coordinate communication between multiple processes or threads.


A person who works to manage relations between is?

A person who works to manage relations is called a negotiator.


Describe the difference between a natural and managed ecosystem?

ang unmanaged ay walang manage at ang manage ay may manage


What is the difference between the manage printers permission and the manage documents permission?

Manage Printers - The Manage Printers permission gives users the right to modify the printer's properties and to change the permissions that apply to other users. Manage Documents - The Manage Documents permission allows users to do things such as pause, restart, or delete print jobs.


What is the difference between 'could' and 'manage to'?

managed to refers to a particular situation


A person who helps manage relations between countries is known as .?

a diplomat


What is the difference between a superindent of an ice arena and the supervisor of an ice arena?

the differents between superindent and supervisor in a ice arena is that the superindent cleans up the arena and the supervisor manage. That's the differents the differents between superindent and supervisor in a ice arena is that the superindent cleans up the arena and the supervisor manage. That's the differents the differents between superindent and supervisor in a ice arena is that the superindent cleans up the arena and the supervisor manage. That's the differents the differents between superindent and supervisor in a ice arena is that the superindent cleans up the arena and the supervisor manage. That's the differents the differents between superindent and supervisor in a ice arena is that the superindent cleans up the arena and the supervisor manage. That's the differents


What did evangelism use to manage long distance between people and communications?

All of them


What is the relationship between tqm and ethics?

you can manage your time with better quality if you have proper ethics!


What is difference between classes and modules?

i think module life cycle manage program..


What did evangelism use to manage long distance between people and poor communications?

All of them


What west ham player managed Cardiff city?

Jimmy Andrews, who played for West Ham United between 1951 and 1956, later went on to manage Cardiff City between 1974 and 1978. Bobby Gould, who played for West Ham United between 1973 and 1975, later went on to manage Cardiff City in the year 2000. Frank O'Farrell, who played for West Ham United between 1948 and 1956, later went on to manage Cardiff City between 1973 and 1974.