Calculate the area you need to treat.Refer to the product you'll be usings,coverage estimate(s). It's simple math really but somewhat tedious. LOL.Metric calculations I'm not used to,
but let's say you have some plaster and it weighs 10 lbs.And let's say a pound can be spread over a 3 sq ft area @ 1mm thick.Thats 30 sq ft of coverage for that 10 lbs of plaster.So you might need 30 lbs for that ceiling,assuming it's area is 90 sq ft. There are numerous ways to calculate coverage area. And all of them only require simple math skills.
Though I wouldn't recommend putting cement, on your ceiling generally.Your driveway yes.Your ceiling no.Gypsum plaster would be more suitable, and you can find it everywhere,premixed and ready to apply in 5 gallon buckets.Good luck.
Cement is not used for plastering, plaster is used for this.
Seven parts washed grit sand to one part cement. The grit gives it it's strength. If you use building/plastering sand it will crack.
cement consumption in M-25
punning is the method of cement finish, in a very thin layers about 3-5mm, applied on the internal or external walls/ roofs/ beams/ columns, to give aesthetic effect as well as for seepage protection. also it is used to hide the plastering cracks.
M 15 grade - 1:2:4Cement bags required - 6.5 bagsCement required - 325 kgs
Cement is not used for plastering, plaster is used for this.
rr
Seven parts washed grit sand to one part cement. The grit gives it it's strength. If you use building/plastering sand it will crack.
cement consumption in M-25
100
The type of sand is also important. The right ratio for a mixture of cement and sand is 1:5 to 1:6
For the ceiling that your looking for would be cement
Solid plastering is the occupation of covering surfaces and producing a finish ready for painting. There are several methods including but not limited to; Sand Finish - cement based product that is "floated" then "sponged" to produce a flat and sandy finish
cement, mainly used for brick work or plastering. can also be used to describe mud plaster
You will need about a bag of cement for this project. You will also need around 0.15 cu.m of sand.
about 10square meters
it is based on quality of construction and our design strength it is based on quality of construction and our design strength it is based on quality of construction and our design strength