You can display ground levels by labeling in legend or, you can add a elevation measure, such as (ground +0,00) ( 1rst floor +3,07) and so on...

User Avatar

Wiki User

11y ago

What else can I help you with?

Related Questions

What is site plan?

A Site Plan is a drawing that depicts the site of a proposed or existing project.


How do I obtain site plan for my property?

For a detailed description on how to prepare a site plan you can go to http://www.mysiteplan.com/blogs/news/9892476-how-do-i-draw-a-site-plan . There are other useful tips on the site and if you need they can draw a site plan for you.


What is reducing level at site?

The reducing level at a site refers to the process of lowering the elevation or height of the site. This can be done through excavating or removing material from the site to create a flat or even surface. Reduced levels are commonly used in construction to prepare the ground for building or development.


How can a site be changed from French to English?

It is by changing the display language option that the site can go from French to English.Specifically, the display language can be determined under the keyboard/language options. These options may be accessed through the regional/language options. Just select "English" as the site's display language.


What can one summit their personal site plan?

One can submit their personal site plan at a website called Google, where a rating for your site plan will be given. If one is talking about geographical matters, then it must be submitted to the state.


How do you link an images in HTML?

To display an image use: To display an image that goes to a site when clicked, use: Replace what is in bold.


How many boreholes are required for soil investigation prior to a new construction?

Depends entirely on the size of the site (plan area) and the size of the building being designed. Typically between 5-10 for a medium sized site plan. It may also be established during the initial SI that the ground conditions are complex and that further bore holes and trial pits are required. Site investigation is an iterative process.


Is Ground Zero the site of the Twin Towers?

Yes, the site of New York City's Twin Towers is nicknamed Ground Zero.


How do you take earthwork quantity?

Earthwork quantity is typically calculated by first surveying the site to determine the existing ground levels and then using software like AutoCAD or Civil 3D to model the proposed changes. By subtracting the existing ground levels from the proposed levels, you can calculate the volume of earth needed to be cut or filled to achieve the desired result. This calculation helps in estimating the quantity of earthwork required for a construction project.


Who is trying to build the mosque near ground zero?

There is a plan by Imam Feisal Abdul Rauf to build an Islamic Community Center about two blocks outside of the ground zero site. The Community Center at 51 Park Place would be much closer to (for example) the New York Dolls Gentlemen's Club and the Dakota Roadhouse than to the Freedom Tower site. At 13 stories, the Community Center would be about 1/10 the height of Freedom Tower on the Ground Zero site.


What is the difference between location and site?

The SITE location plan is where the ENTIRE SITE is located on the map. Sometimes a worksite comprises of multiple buildings and public infrastructures, so the embodiment of all these structures as a whole is considered the WORKSITE. The building location plan is where a specific building is located IN THE WORKSITE. If the Site only comprises of ONE building then, the site location plan and building location plan should look about the same.


What are the scales for a block plan?

Refer to the question "The differences between a site and a block plan"