The first step is to measure the volume of the amount of concrete for the job by adding up the volume of concrete required for the various parts of the construction. This is, for each part, Volume = length x breadth x depth.
If a 1 part cement, 2 parts sand, and 4 parts gravel mixture is to be used (a common ratio for foundations), 1 bag of cement (1 cu.ft.) + 2 cu. ft. of sand + 4 cu. ft. of gravel yields 4½ cu. ft. concrete.
So, if the total volume of concrete required is 100 cu. ft. then requirements are:
Cement: 100/4.5 = 23 cu. ft. (probably about 23 bags)
Sand: 2 x 100/4.5 = 45 cu. ft. = 45/27 = say 1 cu yard.
Gravel: 4 x 100/4.5 = 90 cu. ft. = 90/27 = say 3 1/2 cu. yard.
I know that you can buy cement at any kind of hardware store (Lowe's). Lowe's probably has contact cement too.
ANSWER In simple terms, the "blaine" is a measure of the particle size or fineness of cement.
1. Measure the work-ability of cement. 2. Determining the quality test of cement.
i have direct contacts in conch cement company. i have direct contacts in conch cement company.
In a place that sells that.
using a cubic ruler
To satisfy the ASTM standard requirements for normal consistency of cement: The Amount of Water that brings the cement paste to standard condition should vary between 22% to 30% by weight of dry cement.
is a measure of the amount of matter in a given amount of space
is a measure of the amount of matter in a given amount of space
is a measure of the amount of matter in a given amount of space
303.5lb
A questionnaire for a cement distribution center, it should include questions about payment for the cement and the amount that it will be sold for. The questionnaire should also include a list of places that the cement could be distributed.