answersLogoWhite

0


Best Answer

Pipe schedule systems were used until hydraulic calculations became the norm in the mid 80's. You can tell if the system is pipe scheduled when the piping sizes decreases as you get farther away from the water source (sprinkler riser). The larger mains will reduce as less branch lines and sprinkjlers are being supplied.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you tell if you have a pipe schedule sprinkler system?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is a pipe schedule?

Pipe schedule tell you something about the wall thickness of a pipe. Higher schedule means thicker wall. The actual thickness must be read from a pipe specification sheet, as it differs from material to material. Typical pipe sch. are Sch 20, 40, 80, 160, XS, XXS.


What is piping schedule?

Pipe schedule tell you something about the wall thickness of a pipe. Higher schedule means thicker wall. The actual thickness must be read from a pipe specification sheet, as it differs from material to material. Typical pipe sch. are Sch 20, 40, 80, 160, XS, XXS.


Can you tell me Difference between pipe schedule 80 and pipe 80?

Schedule 80 means "Pipe Wall Thickness as per Sch.80 of ASME B36.10M". Pipe 80 means "3 inch NPS or 80 mm NB pipe as per ASME B36.10M". Hope that it will answer your query adequately. Regards, Bhatta


How can you tell if a sprinkler system is a dry system?

That is simple. Look for one or more air pumps at the sprinkler system riser. The pump(s) will have a gauge, also, in the line showing what the current air PSI may be at any given time. The gauge may be labeled on its face "Air" but it may not be so marked. A sprinkler contractor's test report to the customer will also show whether the whole system is an air system or if it has both air and "wet" systems present in the building.


What are pipe standarts?

The standards tell the different wall thicknesses schedule 40 is standard then schedule 80 extra heavy and schedule 120 for very high pressure applications.Copper goes by Type K,L ,M M being the lightest


How do you fix the pipe on club penguin?

witch pipe and will tell u :)


How do you know your roof vent pipe is clogged?

You can tell if the roof vent pipe is clogged by watching for slow drains. If air is unable to help force water out of the system, the water will naturally want to remain in position.


98 windstar 3.8 v6.The pipe leaking is made out of metal that splits in two and two rubber hoses are connected to this. What system is this part of and what is it called.?

if it is what i am thinking of it should be part of the cooling system and is probably the thermostat housing It might be part of the fuel injection system. Do you smell gas when the engine is running? Can you tell what is leaking out of the pipe?


What is the schedule for jail?

Do you want to visit someone in jail? Phone first and make an appointment. They'll tell you the schedule.


What is the 2010 Honda insight service schedule?

It will tell you when it is due.


How do you get the master schedule from marauder on epic duel?

plz tell me the answer


How do you tell how much slope is on an existing drain pipe?

With a level