It increases its strength, generally speaking.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

Why is curing important in civil construction?

Concrete increases in strength over time after it first hardens. This process is known as curing. As such time has to be left after concrete has initially set to reach it's design strength (this normally takes around 28 days).


What is mechanical properties of C 30 material?

C30 is a type of concrete mix where the "C" stands for compression strength of the concrete after 28 days of curing. It typically has a compressive strength of around 30 megapascals (MPa) or 4350 pounds per square inch (psi). Other mechanical properties such as tensile strength, flexural strength, and modulus of elasticity will vary depending on the specific mix design and curing conditions.


What is C 3-60 concrete?

C 3-60 concrete refers to a specific grade of concrete that achieves a characteristic compressive strength of 60 MPa (megapascals) at 28 days of curing. The "C" typically indicates a classification of concrete based on its strength and durability requirements, while the "3" may refer to a specific mix design or application. This type of concrete is commonly used in structural applications where high strength is essential, such as in high-rise buildings, bridges, and industrial structures.


What is the compressive strength of M10 concrete at 7 days?

For M25 grade concrete the seven days crushing for site condition shall be not less than 67 % of M25, i.e not less than 16.75 N/mm2 But for target strength of M25 for mix design taken i.e for M25 it is 32 and the 7 days strength shall not be less than 22 N/mm2


What is concrete mix design?

Its the process of selecting suitable ingredients of concrete and determining their relative amounts with the objective of producing a concrete of the required, strength, durability, and workability as economically as possible, is termed the concrete mix design.


Which type of concrete should you use when it must reach its design strength in about 28 days?

concrete made upof ordinary portland cement gain strength in 28days


What is target strength of concrete?

Target strength is the design strength which is determined by whom ever designed mixture of aggregates and the water/cement ratio.


What is the strength of steel reinforced concrete?

The reinforcment will have little or no effect on compressive strength. It will however impact tensile strength. It depends on the concrete mix design and amount of reinforcment, what the tensile strength impacts will be. The question needs to be a lot more detailed to provide a specific answer.


What has the author Shu-t'ien Li written?

Shu-t'ien Li has written: 'Optimum prestress, matrix analysis, and ultimate-strength design of prestressed concrete pier-, trestle-, and jetty bent piles' -- subject(s): Prestressed concrete construction, Prestressed concrete, Concrete piling 'Optimum prestress, analysis, and ultimatestrength design of prestressed concrete combined bearing and sheet piles' -- subject(s): Prestressed concrete construction, Prestressed concrete, Concrete piling 'Optimum prestress, analysis, and ultimate-strength design of prestressed concrete pile caissons' -- subject(s): Concrete piling, Prestressed concrete, Caissons


Why shirinkage in concerete?

Shrinkage in concrete occurs due to the loss of moisture during the curing process. As the water evaporates, the concrete material contracts and reduces in volume. This shrinkage can lead to cracks forming in the concrete if not properly controlled. Factors such as mix design, curing methods, and environmental conditions can influence the extent of shrinkage in concrete.


Concrete cure time?

In anarid region, concrete placed as a road slab or roof slab gets dried up in a very short time, say within 2 hours.This condition should be maintained for 24 hours or at least till the final setting time of cement at which duration the concrete will haveassumed the finalvolume.Normally curing is done for 28days at 90% of strength gain is achievedUntil maximum design strength is achieved (should be 28 days): Concrete does not gain strength by "Drying out". It gains it through a process known as hydration. The road slabs used as an example in the first post will still undergo hydration once water makes contact with the concrete. (rain). k.k


What is the differences between C30 Concrete and C40?

The number relates to the compressive strength of a cube of concrete when tested (i.e. 30 N/mm2 or 40N/mm2) The higher the number the greater the strength of the concrete. The choice of concrete grade is usually made at the design stage for the strucutre and effects the overall strength and resistance of the strucutre to decay. You would use a higher strength concrete in a more exposed environment. It is important to use the concrete grade specified for the proposed strucutre.