answersLogoWhite

0


Best Answer

By talking, drawings and demonstrations

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How does the building surveyor interact with the rest of the building team?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Civil Engineering

What does icm means with regards to construction type?

ICM Construction is a team of professional advocates who help businesses with financial investments. This company is located in Illinois and was established in 2008.


What is the final step in the creation of a work breakdown structure?

Decomposition is a technique used for subdividing the project deliverables into smaller, manageable tasks called work packages. The WBS is a hierarchical structure with work packages at the lowest level of each branch. Based on their complexity, different deliverables can have different levels of decomposition.How do you decompose a Project Work?You can decompose the project work by executing the following steps:1. Identify the deliverables and the work involved by analyzing the project scope statement and the requirements documentation.2. Understand the relationships among the deliverables.3. Structure and organize the first level (Server, UI and Db in our example) of the WBS hierarchy. Based on the project at hand, you can use one of the following approaches:o Use the deliverables as the components in the first level.o Use the phases of the project as the components in the first level.o Use the subprojects as components in the first level. A subproject is a part of the project that is independent enough of the rest of the project that it can be performed by another project team. This approach is useful when you want to outsource parts of the project.o Use different approaches within each branch of the WBS, for example, a subproject and deliverables in the first level.4. Decompose the upper level into more detailed components for the lower level.5. Keep decomposing to lower levels until necessary and sufficient decomposition has been achieved.6. Assign identification codes to the WBS components


What is the role of project management in construction for?

The role and job of project management in construction is for managing a construction project. Project management jobs help organize the construction and the people needed to make the construction.


Roofing Company?

USA has suffered a sizable influx of billion dollar disasters in recent years. We deploy professionals to serve affected communities during emergency disaster strikes and humanitarian crises, causing widespread damage and impacting the most vulnerable . We are proactive members of your community, providing much-needed services to local Emergency Disaster Relief Team response agencies during times of need.


What are the differences between a culvert and a bridge?

A culvert is a structure designed to allow the passage of water, such as a stream or drainage ditch, beneath a road, or railway track. Its primary purpose is to manage water flow and prevent erosion while maintaining the continuity of the road or railway above. A bridge is a structure built to span a gap, such as a river, valley, or road, to provide a path for vehicles, pedestrians, or trains to cross over it. The main purpose of a bridge is to provide transportation facilities also they serve as a pathway over obstacles.

Related questions

Members of a design team that a building surveyor interacts with?

they will interact with people such as murray flood is a giant pratt


Name the black mathematician who was a surveyor on the team that planned the District of Columbia?

Benjamin Banneker was the African-American mathematician who served as a surveyor on the team that planned the District of Columbia. He lived from 1731 to 1806.


Who was the first Black mathematician who was a surveyor on the team that planned the District of Columbia?

edward cox


How do you narrate a team building?

narrate a team building?


How do members of the site construction team interact in terms of their health and safety and welfare roles and responsibilies?

how do members of the construction team interact in terms of health and safety and welfare


Who is in the production team construction?

Project manager, site manager, quantity surveyor, site engineer are the main people.


How do you achieve team building?

Achieving team building involves fostering open communication, promoting collaboration, and creating opportunities for team members to bond and develop trust. This can be done through team-building activities, regular team meetings, setting common goals, providing constructive feedback, and encouraging a supportive and inclusive work environment.


What is a slogan for team building?

One clever slogan for team building is "Teamwork makes the dream work". Another clever slogan for team building is "One spirit, one team, one win".


What is a great location for a team building retreat?

The Garden Venue Hotel is the perfect venue for both corporate team building and team training.


What are the ratings and certificates for Team Building - 2011?

Team Building - 2011 is rated/received certificates of: Singapore:NC-16


Which developmental stage of team building does the team feel that they have ownership in the team?

Collaborative


Building effective team communications?

Communication is the ground level, or first link in the team building chain. It is of the utmost importance that communication is clearly defined and understood between all members of the team. Team communication begins with the leader and then is reinforced throughout each aspect of the team. For more info see the article "7 Links in the Team Building Chain" available at www.leadersbridge.comm/team-building .Craig- www.leadersbridge.com