Want this question answered?
First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.
Imediatly after trowling
it has to be tacky!!!!!!!
You must remove the old epoxy coating before pouring the new floor, for otherwise there will be no bonding. If the epoxy coating is thin (e.g, paint) then it may be possible to remove it by hand sanding. If it is a thick coating, then sandblasting is probably the best method. In either case, appropriate dustmasks and other safety precautions are essential. Good luck
what is the slump value for M20 concrete
It is possible to use a dirt wall when pouring concrete, but the liquid of the concrete will not make neat edges. The wall must be tamped firmly. This will work on shorter projects, but not on taller ones.
First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.
To embed large metal objects in the ground, holes must first be drilled or dug into the ground. If the metal object is a post, then the post is installed in a hole in the ground that is then surrounded at the base by concrete before being covered back up.
Imediatly after trowling
it has to be tacky!!!!!!!
You must remove the old epoxy coating before pouring the new floor, for otherwise there will be no bonding. If the epoxy coating is thin (e.g, paint) then it may be possible to remove it by hand sanding. If it is a thick coating, then sandblasting is probably the best method. In either case, appropriate dustmasks and other safety precautions are essential. Good luck
Reinforcement makes the concrete stronger, in particular it gives the concrete tensile strength as opposed to just compression strength. It must be used for certain types of foundations / types of ground and also other forms of construction too
Concrete in the bulk is measured in cubic yards. Concrete on the ground is often measured by square yards, but the depth of the concrete must be known, too. The price per cubic yard varies a lot across the US, plus not knowing the thickness of the concrete means that your question cannot reasonably be answered.
Precast concrete is a construction element made of that material and finished before its installation in the building frame. The mix of concrete must be cast or scaffolded until it gets enough strengh to handle and support own weight.
The concrete preparation must be seen to carefully before laying tile. The initial surface must be very clean and the cement laid out as smoothly as possible prior to tiling.
This Must Be Ground was created in 2004.
what is the slump value for M20 concrete