The bridge construction started in 104CE and finished in 106CE. (approximately 2 years)
how long does it take to build a beam bridge of 2400 sq ft
it took 3 months to build the iron bridge in Newport Pagnell
They began to build it in 1925 and it opened in 1928.
The current bridge was built between 1968 and 1973.
About 4 years.
5 years
About 4 years.
200 years
8 years
Because it's a bridge and bridges take along time to build. If you don't like that, then try building you own bridge to see how long it takes you. (Didn't mean the in a mean way)
1886 to 1894
10 years