Want this question answered?
The first Spitfire took about 5 months to build and first flew in March 1936.
The first Spitfire took about 5 months to build and first flew in March 1936.
It cost about 9,000 pounds to build a Spitfire.
The Spitfire is mainly aluminium.
A Spitfire was 30 ft. long.
The Spitfire assembly line employed hundreds of people.
how long does it take to build a asimo
how long did it take to build the half moon
how long did it take to build the scottish parliment?
how long did it take to build cabot tower
At the height of wartime production, Spitfires were being built at 6 every day.
aluminum pots and pans