You would need 31, 80 pound bags to cover 1 cubic yard at 4 inches deep. If you would like the depth to be 6 inches, 45 bags would be needed.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
Cubic feet needed is the thickness is 4 inches:416Cubic yards:15.3660 pound bags92580 pound bags 694
about 10-12 bags approx.
9 of them
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.
7 bags cement
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
65 BLOCKS PER 74 POUND OF MORTAR (THAT YOU ADD SAND TO) 80 POUND PREMIX MORTAR JUST ADD WATER 27 BLOCK 8X8X16
Cubic feet needed is the thickness is 4 inches:416Cubic yards:15.3660 pound bags92580 pound bags 694
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
7 cement bags per 1 cubic meter of concrete......
about 10-12 bags approx.
11 bags
In order to find the amount of mortar needed, take the number of bricks and divide it by 30. This will be the number of 60 pound bags of mortar mix you will need. 100 bricks will require 3.3 bags (about 191 pounds) or 4 bags depending on if they are purchased new and full.
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.
You will need about 7 25kg bags of cement.
.050 meter cube