Want this question answered?
i live in an apertment block it is 150 meters long it has an underground garage.a ground floor a first and second floor.it steps down .as it is going down a hill .how many vertical expansion joints should be in it.it is constructed with re-enforced pillars block work then rendered
That is ten tons, so I know the answer can't be 'who', but 'what'. Many large construction machines or fork trucks could carry this.
It starts curing the second they put water in it.
it takes more than hours to become profession it takes years to reach perfection and pro skills hope this helps go on google if im wrong!
Most Civil Enginners work between 50 and 60 hours per week any engineer can even work 5 hours a day and still get payed either $5,000 to $10,000 dollars anyway
A mason may be able to do acc block but acc block cannot do mason.
100
150
If a mason is working on a block the time it takes to carve it depends on the details of the shape being carved, the material it is being carved from and the size of the block.
61
8
You need 8 cubic blocks of sides 0.5 inches to make a 1 inch block.
Volume of 1 inch block is 1 cubic inch Volume of 1/2 inch block is (1/2) x (1/2) x (1/2) = 1/8 cubic inch Therefore number of 1/2 inch blocks in 1 cubic inch block = 1/(1/8) = 8
4
150
Two measurements are indication of area. The area would be 144 square inches.
More information is needed EG what type of 12 inch blocks there are many(see link below). Also what way up are you using these blocks. http://www.boralbestblock.com/product-lines/masonry/standard-block/12-inch-block