2
It should be a little over 19 yards.
10 80# bags will fill about 6 cubic feet, so 375 bags should fill 225 cubic feet (30 x 30 x 0.25).ANS 2 -At least in my area, it would be much cheaper ordering this to be delivered by a concrete truck.An 80 lb. bag of concrete is 2/3 of a cubic ft. of concrete. 3 bags is 2 cu. ft. So for 225 cu.ft. youll need 338 bags of concrete.
The answer depends on whether you mean 114 feet squared or a square 114 feet by 114 feet. The answer to the first scenario is 76 square yards of concrete. The answer to the second scenario is 8,664 square yards of concrete.
double the cost of 1 yard, and twice as less 4 yards...haha
I need one and a haft yards of sand. If the bags hold 2 cu feet how many bags do I need
Bags of what? Grass seeds? Cement? Sugar?
the minimum is 2 yards.
2
When it comes to mulch or concrete, a so-called "yard"actually means a "cubic yard".1 cubic yard = 27 cubic feet2 cubic yards = 54 cubic feet...6 cubic yards = 162 cubic feet ( = 81 bags )
This cylinder will require 1.4 cubic yards of concrete (this assumes a length of 12' and a width of 2').
1 cubic metre of m25 concrete = 2 400 kg, so 2 400 / 50 = 48 bags
roughly 2900 bags of 80Lbs. bags. (would actually make 64.4 Yds cube better to get trucks and pumper each truck canaries one truck carries about 8-9 Cubic yards
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
8
1 cubic yard is 3x3x3 = 27 cubic feet 49 yards = 49x27 = 1323 cubic feet 1323/2 = 661 bags - that is a lot of bags! Make sure by yards you mean actual cubic yards, not linear yards, in which case you need to know depth and width of mulch as well
10 80# bags will fill about 6 cubic feet, so 375 bags should fill 225 cubic feet (30 x 30 x 0.25).ANS 2 -At least in my area, it would be much cheaper ordering this to be delivered by a concrete truck.An 80 lb. bag of concrete is 2/3 of a cubic ft. of concrete. 3 bags is 2 cu. ft. So for 225 cu.ft. youll need 338 bags of concrete.