20
it takes about 15. my dad does it.
U need 1.63 80lb bags per square ft so 131bags to do 8ft by 8ft
7.1
6.67 Cubic Yards
15 cubic yards
129
it takes about 15. my dad does it.
If you pour to a standard 4-inch thickness you will need 5.6 cubic yards.
If your pour to a standard 4-inch depth, you will need 3.54 Cubic Yards.
55.56 cubic yards.
U need 1.63 80lb bags per square ft so 131bags to do 8ft by 8ft
3,800 square feet at a 4-inch depth requires 46.91 cubic yards.
2x2
you are going to want at least a 6 inch base of packed stone, then at least six inches of concrete reinforced with either rebar or highway rated mesh.
how much does it cost to form and pour concrete in Mobile, AL
about how much to pour a concrete slaba 12 x 14'
POUR THE CONCRETE OVER THE BRICK