Wiki User
∙ 14y agoIt depends on the usage of the concrete. For footings, you would need 5 bags of cement. For sidewalks, etc. you would need 6 bags. Generally, if you know the usage it's for, you can contact a local ready-mix plant and they can tell you exactly.
Wiki User
∙ 14y ago4.4 bags
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
10
10.94 bags
in india, for m-20 cement concrete, for 1 cu.m.- 3.47 quntl cement-0.45 cu.m. sand( fine aggr.)- and 0.90 cu.m. chips( course aggr.), that means 6.94 or 7 of 50 kgs.cement bags so for M-25, for 1 cu.m. 4.03 qntls cement- 0.45 sand- 0.90 cu.m. chips, so 8.06 cement bags
25
Depending on the use of the concrete, between 5-6 bags.
4.4 bags
7 cement bags per 1 cubic meter of concrete......
well concrete mix is a 1/3 gravel , 1/3 sand and 1/3 portland cement . I hope this helps.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
2million
That will depend on the thickness (depth) of the concrete.
15 milligrams
10