Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
A 15' x 20' x 4" slab needs at least 3.7 cubic yards.
typically one pallet, i believe theres 42 80lb bags on a pallet.
9 of them
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
4 bags of 50 kg each= 200 kg of cement.
7 cement bags per 1 cubic meter of concrete......
11 bags
7 bags cement
A 15' x 20' x 4" slab needs at least 3.7 cubic yards.
typically one pallet, i believe theres 42 80lb bags on a pallet.
The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags!
Depending on the use of the concrete, between 5-6 bags.
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.